HomeMy WebLinkAboutINSPECTIONS - 01-00040 - Colonial TK & Auto Plex - Remodel4
INSPECTION TICKET
� Bldg. ❑ Plumb. ❑
Elect. ❑ Mech. ❑ Fire
Inspection Re -quest: Recd By
r _
I'l-o*
{
ICCI
Address
Ills,r)eCtion Type
day /Time Req.
t
Je
p
bite
A
Phone No.
Permit No.
Inspectol-"s R0t-t 61 - mmummm
des. co",".
INSPECTED ITENIS CONF0 R�N I�T O�A �PP �vn �w r, �jr,
J SPE 'S
DWGS
JvPRO E
+0.(FINA I')
ACTION REQUIRED.
i ed—
it Ac
I'lle - office Copy
F-F1FJ, 003
o
I
--) I . PPR V
F j NOT L I
,
Fly
D ' El
FINAL
UjDID NOT
T
'ref[01, - Job Copy
IfIsPector
,n, - Inspector's Copy
INSPECTION TICKET
Bldg. J Plumb.
'Its-Pection Requq-
Req. By
0 ) F j
I u"s'
� Elect., ti..i Mech.Ire.F
TX) ecdBy ��
Dale
Inspection Type
day /Tillie seq.
'n'sPect0'-%s
N
Phone No.
Perm lat ?Vn
1
r7N L-
i
L! �
:zAol
� L �
INSPEcTFD6TI T7E, S
I �RM TO APPROVE
S ACTIO
KAPPROVED
0 C. 0, (FINA
ACTION � -
�a
n d
meOffice O
-P,F7
I],iSAPPROVE,D
0 NOT APPLICABLE
Alf- /i'?�loyz
elf0 - Job Copy
J VINAL
':� L DID NOT INSPECT
e�tiL
risk. - Inspectors
111Lt r
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections,-, For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1, LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3.
4.
61
X1
7.
9.
10.
11.
1 2.
Foun�QA��on� 1�vsPEc�1aN:
The foundation inspection shall included excavations for thickened slabs
intended dor the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. ASI forms and
reinforcing steel, etc., shall be in place.
PLUMBING, MECHANICAL ANS ELECTRICAL:
Rough inspection: Commonly made prior to covering or cancra#ment,
before fixtures are sed, and prior to framing inspection.
TRUSS INSPECTION:
Inspections of trusses.
FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
SIDEWALK INSPECTIONS'
After forms are set, prior to placing concrete.
FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy,
OTHER INSPECTIONS:
In addition to the caped inspections above, thebuilding department may
maks or require any other inspections to ascertain compliance with this
rnrttn. and other lawq enforced bv the buildina deDartment.
INSPECTION CARD
the permit holder or his agent shall post theinspecTion record on the jab site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-37F7 Building: 359-3020 ex 326 or 31.3
Plumbing: 359-3p2,0 ex 326 orAl 3 or 359-3U34
Signature.