Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 01-00039 - Parkside Townhomes - Bldg 3 units 9-13CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building official, upon n0j.1flCration from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1.1 LAYOUT: Lot corners staked, staking in place for building, prior to excavation �OD�I�U' Y �d�1� �� DY pl�Ps aPA Se� oruenckes or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL:0 Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing ars ire place and after the plumbing, mechanie,al and electricsl rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboardjoin#s and fasteners ars taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are sed, prior to placing concrete. 10, FINAL INSPECTION: Commonly made after the building is competed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS:, In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other haws enforced b�, the building depa�ment_ INSPECTIU�V CARD The permit holder or his agent shah post the inspection record on the job site in an accessible and conspicuous place to allow the bUilding official to make the required entries. The record sham be maintained by the permit holder until the final inspection has been made and approved. i have read the above and will comply in my requests for inspections by givin 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Building: 359-3p20 ex 325 or 313 Plumbing: 359-3D20 ex 326 or 313 or 359-3034 11 Signature.- &Z, Y_ S / Date: �