BUILDING INSPECTION SEQUENCE
Type of inspections: For an -site construction, from time to time the building official, upon
notification from the permit holder or his went, shall make or pause �v be made any necessary
inspections and sham tither approve that portion of the construction as competed or shad notify
the permit holder or his agent wherein the same fails to comply with this code.
1 . LAYOUT: Lot cornus staked,shaking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are yet or trenches or basement
31.
4.
areas are excavated.
vertical reinforcing out
FOUNDATION INSPECTION:
Forms
and
horizontal
reinforcing tied in place,
and on
jab
site or tied
in place.,
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for woad foundations. AIS foams and
reinforcing steel, etc., shall be in place.
PLUMBING, MFCHANICAL AND ELECTRICAL:
Rough inspectiona: Commonlymade prior to covering or congealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
G. FRAME INSPECTION:
Commonly made after the goof, all framing, firestopping, draftstopping and
bracing ars in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performedl through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished'.
8. FINAL PLUMBING AND HEATING, INSPECTION:
All systems in place, fixtures. set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections abase, the building department may
make or require any other inspections to ascertain compliance with this
code and other haws enforced bV the building department.
INSPECTION CARD
The permit holder or his agent shall past the inspection record on the jib si"te in an accessible
and conspicuous place to allow the building official to mike the required entries. the record
shad be maintained by the permit holder un#il the final inspection has. been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767 Building: 359W3020 ex 326, or 313
Plumbing.- 359-3020 ex 325 or 313 or 359-3034