Loading...
HomeMy WebLinkAboutREVIEW - 01-00033 - Ricks College (BYUI) Heat Plant - Addition/Remodele eo�s - 1J6QQ*'1N -OM% A . " �b vr!11 ,LISA C z� . 11/13/2001 Lloyd Benson BYU Idaho Physical Plant Rexburg, ID 8.1440 dear Llovd, r I yte STATE OF IDAHO 0 P.O. Box 280 North renter Street RexfDurg, �dafio 83440 Phone (208), 359 r (208) 3`5101-13022 www.cl. rexburg.idus F-7 - t t � Ck I =.Ok U I L.A. � 6=0A I am writing to you in regards to the conversation we had an 11/9/01 concerning the issuance ofbufld�ng permits. for work being perfonned at BMJ Idaho, As per our conversation, you histructed me that there was an agreement made between the college and the City of Rexburg that allowed building permits to be waved when non-structural remodel work was to. be performed. I met with Jahn Near on this issue and he agrees with what you told me, if the work is cosmetic in nature. He did afF= that permits ars stili required when plumbm"g or mechanical work is taking place and when the work affects exiting, fwe resistance, occupancy, accessibility, safety, etc. We need a buildm'g permit dor the remodel of the donms. Please some �. as soon as possible and attain the perrrit at the City CICTWS office_ Delynn Edstrom is OUT plumbing inspector. He vvifi need to inspect all of the new plumbing, Any structural cha,nc,,Fes wiU need to be inspected by myself. I will work with the Fjre Department iinspector for final inspechon_ Please het with me as soon as possible concerning Ns matter. You should not be cov�r�g new c�n�tru���o�4 ��you �.a.�e any quest�ans pease give me a call at 359-3020 eta 324-. Sincerely, Val Christensen Building Official cc John Millar Chris Huskinson Delynn Edstrom 11 MP jr��m�� ) 11 i-liq �-9k;*IZIOZII IIIIUVjA'W'I5*I0 * A-41W*l i. P.O. Box 280 26 North Center Rexburg, Idaho 83440 (208) 359-3010 1997 Uniform Fire Code Pian Review Building Names. Ricks College Duran 35 Building Address: Ricks College Plan Date: 03/01 Review Date:04/05/01 Stories: 2 Type of Construction: II Occupancy Classification: R-1 Existing Floor Area:U/K New Construction Floor Area:U%K 1) Required Fire Flow (Appendix III -A) U/IK Comments : Need to have square footage for fire flows 2) .Water Supply (Article 9, Section 903) Required: Yes Fire Hydrant Location: Fire Hydrant Flows: Fire Flaw Test Location: Fire Flaw Supplied By: Other Approved Water Source: Water Supply Acceptable: Fire Hydrant Location Acceptable: Water Supply Comments: Water supply acceptable as is 3.,)Fi*re Apparatus Access Roads (Article 9 Section 902) Required: Yes, see comments Acceptable : Width: Length; Surface: Turningi -rade : Vehicle =t cam.l Clearance to Complete load .Acceptable Turn Arounds: Comments: Access acceptable as is 4) Access Roads and dater Supply,, including Fire Hydrants Are Required To Be Installed And Made Serviceable Prior To And Boring Time Of Construction Comments: Yes (Article 9 Section 901.3) : 5) Installation Of Portable Fire Extinguisher (Article 10 1.002) Required: Yes Location Acceptable: ET/K Type Provided Acceptable,: U/K Comments; Need to. install 2A-10BC throughout Section 6) Automatic Fire Extinguishing systems: (Article 10 Section 1003 Required: Sprinkler See CO- m-nents Type Of System Being Installed: U/K 11 System Monitoring Required (Article 10 Section 10a3.3) Requ11 ired: See comments state sprinkler system was plans have been submitted. 7) . Standpipes Type Required: Comments: Spoke to Tam Leman who to be installed. As of review date no (Article 10 Section 1004) Comments Required: No 8) Ventilating Hood And Duct Fire Extinguishing System (Article 10 Sect -ion 1006.2) Required: 1ri4 Type Being Provided Automatic Fuel Shutoff Shown (.Article la Section 1006.2.4) 0- Portable Fire extinguisher shown (Article ld section 1006.2.7) Comments: 9) Fire Alarm Systems C . ents bezoar {article 10 Sectio. 1007) Required.. Type Of System Required: Manual.* Automatic: Both: Type Of Systems Being Provide.: Manual: Automatic: Components Of system Shown: Smoke Detectors: Manual Full Station: Door Holders: Sprinkler Valve Sounding Devices .IP Duct Detectors: F1 ow Both. Heat Detectors: Visual Alarm: Devices: Monitoring: Fire Alarm System Acceptable: Camments: Spoke system was to be Alarm system was ADA requirements been submitted. to Tom Leman installed in thought to. be certain areas >n wove date and was told alarm conjuction with sprinkler system. a congregate system complete with end smoke detectors. No plans have 1Q7.Other corrections That Are Required By Special Occupancy Or Conditions: Plates As Submitted Plans Checked By: Please manner: Chrls furnish comments Acceptable: NO Huskinson hack to the, plan Written Comments: YES --Need plans for sprinkler system, alarm fire extinguisher size and placement, measurements to figure f±re flow.--- Dade: 04/05/01 reviewer in the fallowing New Plans: YES system, smoke detectors, and also square footage