Loading...
HomeMy WebLinkAboutREVIEWS - 01-00030 - Dr Grant Davis Medical Office - New Building8/1412001 Stan Palmer 2916 W. 17 South IdahoYalls, ID 83402 Dear Sian, STATS OF IDAHC www.ci _ rexbu rg. id . us I have reviewed Your drawings for items that need to be included or changed: P.O. Box 280 -112 North Centertrt Rexburg, 'Idaho83440 Phone X208) 359.3020 Fax f 2M 359-3022 e-mail rexburg@qcLrexburgJd.us the Davis Medical Building. Below i's a list of 1. Please provide accessible bath details as per the 1997 Uniform Buildffig Code (UBC) Section 1105. 1. 2. Provide Truss details. It is puce to have these at time of review, but I must have them prior to frame inspections., -3. Pa dist of storage items that will be dept gin, all storage areas 4. Please Shaw exit signs at the back entrances and heading to these entrances as per �. 997 UBC Section 1(�O� 2-2-.�oS 5. Please show an attic access opening as per 1997 UBC Section 1505. L 6_ Provide attic space venting details as per 1997 UB(" -0, Section 1505.3t 7. Show draft stop as per 1997 UBS Section 708.3.1.2.2. S. CAty ard�nce requires that foundations shall be constructed at a minim�sm of 36" below grade dor frost considerations. if this requi�°ement can't be met dui to the position of the bedrock, it is acceptable tolacepco��r�e directly o� the rock surface. The rock mush be cleaned prior to concrete placement,, 9, 'lease provide shear gall details. include windca�euia#ions used �n design. 10.- know surer ser"ce comeeted to the suer man,4 not to the manhole. 11. Address the Fire Department issues. I have attached their review at back.. If you have any questions please give ire a calf at 359-3020 ems. 314. S incerely9 Val Christensen Assistant Engineer CC John Millar Chris Huskinson, REXBURG MADISON COUNTY FIRE DEPARTMEN= PvO. Box 2 80 26 North Center Rexburg, Idaho 83440 (208) 359-3010 1997 Unifo Fire Code Plan Review Building Name. Grant Davis Medical Building Building Address,-, Ash Street s Stories: One Type of Construction: V -N Plan Date: U/K Review Date: 8/15/01 Occupancy Classikfication e B Existing Floor Area: N/A New Construction Floor Areat- Approxi -mately 7450 squ3re 1 } - Required Fire Flow (Appendix STI -A) : 2, 000 GPM Comments ; mater suppZY may be reduced sprinkler system is install in building up to 759.,& if ars. approved 2 } . Water Supply (Article 9, Section 903) R Fixe Hydrant Location.&. D-21, D-22 Fire Hydrant F 1 ows : OK Fire Flew Test Location,: D-21, D-22 Fire flow Supplied By,-. FD Other Approved. mater Source: Nome Water Supply Acceptable: YES Fire Hydrant Location Acceptable: YES mater Supply Comments: 0x 3.)Fire Apparatus Access Roads (Article 9 Section 902) Required. YE5 Acceptabie� Width: Turnzng Radius . OR C I a ran c e - OK YES Length: YES Surface a OK Grade : o r, Vehicle Vertical o U/K Turn Arounds : OK Complete Road Acceptable ,m OK Commends: 4 ) o Access Roads and Fater Supply.,-Tncluding Fire Hydrants Are Required To 3e Installed And Made Serviceable Prior To And I)uring TimeIOf CQnSt�'uCtzQr� (Artcle 9 Section 901.3) o YES Comments,, 0 5).Installation Of Portable Fire Extinguisher (Article 10 Section. 1002) Required.,*. YES Location Acceptable: NOT SHOWN Type Provided Acceptable: PROVIDE MINIMUM 2A-10BC AS REQUIRED Comments: SUBMIT LOCATIONS FOR FIRS EXTINGUISHERS -Automatic Fire Extinguishing Systems.: (Article 10 Section 1003 Requirmd : NO Type Of System Being Installed., Sprinkler System Monitoring Requirpc� �Article �.0 Requa-red Comments: 7 ) e SLtandpipes Type Required e (Article 14 Section 1004 ) Comments e 9� Requi.4. �P_ r" i- , l ip03.31 8 } -Ventilating Hood And ]DLUct Fire Extinguishing System (Article 10 Section 1006.o.2) Required-4a,NoITpe Bei.1 ng Provided: Autornatc Fuel. Shutoff Shawn (article 1.0 ,Section 1006.2.4) s Portable Fire Extinguisher Showil (Article 10 section 1005 . 2 a 7) 1#6 �i 0 9 } s Fire Alarm Systems (Article 10 Section 1007) Required: NO Type Of System Requ��edo Man�,al: Auto�atico Both; Type Of System Being Provided- Manual: Auiom�tic : Bath o COmPonents of System Shown.: Smoke Detectors: Heat Detectors: Manual Pull Station: SoundingDeviAces:Visual Devicesa Dace Holders: Duch Detectors : flow Alam:0 Sprinkler Valve Mon�toring : Fire Alarm System Acceptable:_:4 10) . Other Correcti Conditions ins That Are Required By Special Occu�anc�°i�r Plans As Submitted Are Acceptable: YEs Plans Checked By: CHRIS HUSyl.VSOq D at2 4 9u5t 1511F 2001 Please furnish comments hac 0 the plan x-e�riewer in the follow -ng manner; Written Comments: New Pians r a l 7 / 1 �i2002 Dr. Grant Davis 30 Madison Professiona� Park Rexburg, ID 83440 Dear Dr. Dav0 is, STATE OF IDAHO www. ci, rexbu rg. id. us R0. Box 280 12 North Guitar Street Rexburg, Idaho B3440 Phone (208) 3159,3020 Fax (x08) 359-3022 e-mail r bur i {. r bur , d,u It has come to my atienaion that, two ite mandated by the Plot Plan Review for your new building in the Madison Professional Park have not been completed. A fence on the South along Rosewood Subdivision and a buffer an the West �.side �f the property are required as per the ruling by the Rexburg P1annn,or and Zoning (P&Z) Committee. I have attached a copy of the minutes of the P&Z meeing to the bnvk- of t�h;v, document. Please ffinish These two ft A L het me know if I can be of any fart -her assistance. If you have any questions, please give me a call at 359-302Q ems. 324,, S m6ce.T-e-ly, Val Christensen Building .C.C, Matt Babcock John Millar ri F a Ge,ne Palmer; Fi"nal Plat Review for Hidden Valley EPhase U1 and Plim 1�e�ew for Phase .� reinary Plat One issue before the hoard 1 s the final Plat on Hidden Valley Estates Phas 16 lots basicallyhich are west of Phases I and ff. Where are somereview ITT which Consists �f f0110wed through by the City and the,in-depthe�. mathatical re��e w _ e��evv items buy �n11 be by the bounty. Oil the PrellmlillarY pkat review on phase IV, they have basicaliv added 4 dots to the souk Phase TJ which extends, the existing road for two more lotsb h end of Gene expla'ned the purpose fox Phase TV rs W comply With commitments to the subdz�sian. D'Scusslon of the access, a 40' di�ferent people green�e�t and a IO' walk�ray around the cud de sac into the proposed city park, and extension of the street. Phase IIS has a few alterati€� niz between Lot I Black 2 and Loi 1 Block 1 taking same footage away from Bloc'k I a to the corner on Block 2. The water ar�� sewer are in and being testd n nd gzvin8 �tpractice the cu.rb and gutter �� �n b�.� �.ey mill foredo t��pa-ving until °�', as hay beep. their � � nem spring. The maser plan for everything below the Woodmansee�johnson canal is complete and another pian �s being drawn for the project on the other side of the canal. Discussion on the streets. Jahn reported that Phase and IV have been overall reviewed and there are n� real requested that no new phases be approved un��l there is aoverall m problems. it �s needs to some back before the Board for rev�eu�. Gene re acted tMs aster plan. Tie yew p�aplanpr�senied ���hin two wee%s. F master plan should be Dick declared a conflict of znterest. Ted made a mot'vrl tO approve the final plat on phase ILS subject to City EtigqneeMahan was seconded by Bobbetie, a�1 voted a e .one oDi�ckrind review.3' , opposed. abstained Ted made a motiOn to approve the prel iminary pkat v44th changes to Loi 1 � Bloek 2 being dra..n Mpxope�ly. otYon was seconded by G�en�, all voted a Q aye, none opposed. Dick abstalned. Plot Pian Review for Dr. Grant Davis Sohn Millar reported that this is a development of a dot 'n the southw PrOfess'onalI Park �oca�ed on the south end of Ash. The south Ione �s est corner of Madison Addition. The only problem with the setbacks is the issue of the �dioining the Rosewood PropeM,' which Will require buffer�ng with �ither a fence andlor b ffe�' and west edge of that an cng�.����� �r�� iss�u�, �he�r wvul.�d hke t�o ��.d a better way for the sewerthantD � Tie o�h�r problem is parka*na lot. to go 250'across the Stan Palmer, architect for Dr. Davism, discussed the location ofthe se updated copy of the plan, there is an exa.sting sewer manhole wee. He presented an aPpTaa�Xmately 40' from the existing asphalt edge' of the�ht�h �e way not aware of � roper�.3'�. T�v.s is a sloping s�te, nth the 2 Un -W setbacks,, to get ennua.h parking fog' the requirements of the CI'ty they have to have a small parking lot along the south side. There is approximately 5000 sq.. ft. of finished space in the building. Discussion of buffers, traffic, parkincy -requirement of ") 5 stalls the location of the dumpsiexs and the need for addresses on Ash Street rather than Nladison Professional Park. Dick made a motion to approve the plan subject to a fence on the south and a buffer on the west and appropriate City Department approvals. Bobbette seconded the motion, all voted aye, none opposed,. For information only, Ted discussed a proposed project for student housing located on property on 2"d East nem to the armory, V- 3