Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 4 - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/20/2021 File Name: 21021DFR07202120LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/21/2021 D46DF45D-32FB-4EEC-ACD8-B22640E76C3D 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Gymnasium partition walls Observations/ Remarks: Arrived on site around 12:50 PM and inspected masonry reinforcement rebar. Reinforcement was observed to meet specifications for size, grade, placement, spacing, and lap length. Grout was placed according to specification with vibrations at every vertical rebar. Masonry reinforcement and grout placement inspection observations were reported to Eric from ML masonry. Left site around 2:00 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/20/2021 File Name: 21021DFR07202120LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/21/2021 D46DF45D-32FB-4EEC-ACD8-B22640E76C3D 2 Inspection Date: 07/20/2021 File Name: 21021DFR07202120LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/21/2021 D46DF45D-32FB-4EEC-ACD8-B22640E76C3D 3