HomeMy WebLinkAboutSPECIAL INSPECTION 4 - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/20/2021
File Name:
21021DFR07202120LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/21/2021
D46DF45D-32FB-4EEC-ACD8-B22640E76C3D 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
12:30 PM
Client:
Madison School District
Contractor:
ML Masonry
End Time:
02:30 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Gymnasium partition walls
Observations/ Remarks:
Arrived on site around 12:50 PM and inspected masonry reinforcement rebar. Reinforcement was
observed to meet specifications for size, grade, placement, spacing, and lap length. Grout was placed
according to specification with vibrations at every vertical rebar. Masonry reinforcement and grout
placement inspection observations were reported to Eric from ML masonry. Left site around 2:00 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/20/2021
File Name:
21021DFR07202120LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/21/2021
D46DF45D-32FB-4EEC-ACD8-B22640E76C3D 2
Inspection Date:
07/20/2021
File Name:
21021DFR07202120LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/21/2021
D46DF45D-32FB-4EEC-ACD8-B22640E76C3D 3