Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 3 - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/19/2021 File Name: 21020DFR07192021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/19/2021 10AE5A61-5456-41D5-B5F4-ACA3A3C2D71B 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Center hallway partition walls. Observations/ Remarks: Arrived on site around 1:00 PM and inspected masonry reinforcement rebar. Masonry reinforcement was observed to meet specifications for size, grade, placement, spacing, lap length. Masonry grout was placed according to specification with vibrations at every vertical reinforcement rebar and passing inspection observations were reported to Eric from ML Masonry. As only 5 yards of grout were delivered instead of the usual 10 and there were no complications with grout placement grout placement was completed relatively quickly, left site around 1:30 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/19/2021 File Name: 21020DFR07192021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/19/2021 10AE5A61-5456-41D5-B5F4-ACA3A3C2D71B 2