HomeMy WebLinkAboutSPECIAL INSPECTION 3 - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/19/2021
File Name:
21020DFR07192021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/19/2021
10AE5A61-5456-41D5-B5F4-ACA3A3C2D71B 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
12:30 PM
Client:
Madison School District
Contractor:
ML Masonry
End Time:
02:30 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Center hallway partition walls.
Observations/ Remarks:
Arrived on site around 1:00 PM and inspected masonry reinforcement rebar. Masonry reinforcement
was observed to meet specifications for size, grade, placement, spacing, lap length. Masonry grout was
placed according to specification with vibrations at every vertical reinforcement rebar and passing
inspection observations were reported to Eric from ML Masonry. As only 5 yards of grout were
delivered instead of the usual 10 and there were no complications with grout placement grout
placement was completed relatively quickly, left site around 1:30 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/19/2021
File Name:
21020DFR07192021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/19/2021
10AE5A61-5456-41D5-B5F4-ACA3A3C2D71B 2