Loading...
HomeMy WebLinkAboutDEQ LETTERS - Parkside PUD PH A - Jester, JohnSTATE OF IDAHO E. DEPARTMENT OF ENVIRONMENTAL QUALITY 900 North Skyline, Suite B • Idaho Falls, Idaho 83402-1718 • (208) 528-2650 Dirk Kempthorne, Governor C. Stephen Allred, Director September 21, 2001 Design Intelligence, LLC Attn: Scott Spaulding, PE 135 E. Main Rexburg, ID 83440 Re: Parkside Planned Residential Development Preliminary Plat Review, to the City of Rexburg, Madison County; DEQ #: 01-06-33 Dear Scott: On Friday, September 21, 2001, we had a meeting to review the proposed plat for Phase A of Parkside Planned Residential Development. The plat appears to meet state standards, but we, at the Department of Environmental Quality (DEQ), will require the following: 1. Submittal of the pre -construction plans, specifications, and applicable DEQ checklists for Phase A of Parkside Planned Residential Development. 2. Submittal of the proposed wastewater pump station. To be provided by the City of Rexburg, as per your conversation with Mr. John Millar, PE, City of Rexburg's Engineer. 3. This office has already received a will -serve letters from the City of Rexburg's Water and Wastewater Systems for the increased loads and demands. A copy of the preliminary plats will be kept on file at this office. Please reference DEQ#: 01-06-33 when submitting the pre -construction plans, specifications, and checklists for Phase A of Parkside Planned Residential Development. If you have any questions regarding this letter or if we can be of any further assistance, please call me at (208) 528-2650. Sincerely, Ryan Urbanec, Water Quality Engineer, DEQ-IFRO Cc: Greg Eager, PE, DEQ — IFRO; Richard Horne, D7HD — IFRO; Craig Hammond, State Plumbing Inspector; Steve Nielson, 2230 N. University Ave., Provo, UT 84604; John Millar, PE, City of Rexburg — Engineering Dept., Box 280, Rexburg, ID 83440; File; AORIL STATE OF IDAHO DEPARTMENT OF ®A� ENVIRONMENTAL QUALITY 900 North Skyline, Suite B • Idaho Falls, Idaho 83402-1718 • (208) 528-2650 September 24, 2001 Design Intelligence, LLC Attn: Scott Spaulding, PE 135 E. Main Rexburg, ID 83440 Re: Parkside Planned Residential Development Review, to the City of Rexburg, Madison County; DEQ #: 01-06-33 Dear Scott: Dirk Kempthorne, Governor C. Stephen Allred, Director On Friday, September 21, 2001, we had a meeting to review Phase A of Parkside Planned Residential Development. As per our conversation on Monday, September 24, 2001, on the submittal of the plans, the plans appear to meet state standards and are hereby approved, under the following conditions: 1. Submittal of plans and specifications of the stormwater retention pond. 2. Submittal of the proposed wastewater pump station plans, specifications, and checklist. To be provided by the City of Rexburg, as per your conversation with Mr. John Millar, PE, Engineer for the City of Rexburg. 3. Where necessary maintain the required eighteen -inch (18") vertical separation between potable and non -potable water lines. 4. Where necessary maintain the required ten -foot (10') horizontal separation between potable and non -potable water lines. 5. Submittal of the as -built plans or a letter of certification stating that the project was installed with substantial accordance to the approved plans. 6. This office has already received a will -serve letters from the City of Rexburg's Water and Wastewater Systems for the increased loads and demands of the whole Planned residential development, satisfying that requirement. This approval is for the system design only. We will give final approval after it is established that the system is operating properly. Deviations from the approved plans, which might result in violations of Idaho Regulations, must be reviewed by this office before field installation. This office must be kept informed of the scheduling of all construction phases so that we can make spot inspections as necessary. This approval will expire on September 25, 2002. If construction is not complete by the expiration date, plans will need to be resubmitted for approval before further construction proceeds. Within 30 days after construction, a professional engineer registered with the state of Idaho must provide this office with as -built plans or a letter of certification stating that the project was installed with substantial accordance to the approved plans. A copy of the plans will be kept on file at this office. Please reference DEQ#: 01-06-33 when submitting any other documentation in reference to the Phase A of this Parkside Planned Unit Development. If you have any questions regarding this letter or if we can be of any further assistance, please call me at (208) 528-2650. Sincerely, Ryan Urbanec, Water Quality Engineer, DEQ-IFRO Cc: Greg Eager, PE, DEQ — IFRO; Richard Home, D7HD — IFRO; Craig Hammond, State Plumbing Inspector; Steve Nielson, 2230 N. University Ave., Provo, UT 84604; John Millar, PE, City of Rexburg — Engineering Dept., Box 280, Rexburg, ID 83440; File;