HomeMy WebLinkAboutDEQ LETTERS - Parkside PUD PH A - Jester, JohnSTATE OF IDAHO
E. DEPARTMENT OF
ENVIRONMENTAL QUALITY
900 North Skyline, Suite B • Idaho Falls, Idaho 83402-1718 • (208) 528-2650 Dirk Kempthorne, Governor
C. Stephen Allred, Director
September 21, 2001
Design Intelligence, LLC
Attn: Scott Spaulding, PE
135 E. Main
Rexburg, ID 83440
Re: Parkside Planned Residential Development Preliminary Plat Review,
to the City of Rexburg, Madison County; DEQ #: 01-06-33
Dear Scott:
On Friday, September 21, 2001, we had a meeting to review the proposed plat for
Phase A of Parkside Planned Residential Development. The plat appears to meet state
standards, but we, at the Department of Environmental Quality (DEQ), will require the
following:
1. Submittal of the pre -construction plans, specifications, and applicable DEQ checklists
for Phase A of Parkside Planned Residential Development.
2. Submittal of the proposed wastewater pump station. To be provided by the City of
Rexburg, as per your conversation with Mr. John Millar, PE, City of Rexburg's
Engineer.
3. This office has already received a will -serve letters from the City of Rexburg's Water
and Wastewater Systems for the increased loads and demands.
A copy of the preliminary plats will be kept on file at this office. Please reference
DEQ#: 01-06-33 when submitting the pre -construction plans, specifications, and
checklists for Phase A of Parkside Planned Residential Development. If you have any
questions regarding this letter or if we can be of any further assistance, please call me at
(208) 528-2650.
Sincerely,
Ryan Urbanec,
Water Quality Engineer,
DEQ-IFRO
Cc: Greg Eager, PE, DEQ — IFRO;
Richard Horne, D7HD — IFRO;
Craig Hammond, State Plumbing Inspector;
Steve Nielson, 2230 N. University Ave., Provo, UT 84604;
John Millar, PE, City of Rexburg — Engineering Dept., Box 280, Rexburg, ID 83440;
File;
AORIL
STATE OF IDAHO
DEPARTMENT OF
®A� ENVIRONMENTAL QUALITY
900 North Skyline, Suite B • Idaho Falls, Idaho 83402-1718 • (208) 528-2650
September 24, 2001
Design Intelligence, LLC
Attn: Scott Spaulding, PE
135 E. Main
Rexburg, ID 83440
Re: Parkside Planned Residential Development Review,
to the City of Rexburg, Madison County; DEQ #: 01-06-33
Dear Scott:
Dirk Kempthorne, Governor
C. Stephen Allred, Director
On Friday, September 21, 2001, we had a meeting to review Phase A of Parkside Planned
Residential Development. As per our conversation on Monday, September 24, 2001, on
the submittal of the plans, the plans appear to meet state standards and are hereby
approved, under the following conditions:
1. Submittal of plans and specifications of the stormwater retention pond.
2. Submittal of the proposed wastewater pump station plans, specifications, and
checklist. To be provided by the City of Rexburg, as per your conversation
with Mr. John Millar, PE, Engineer for the City of Rexburg.
3. Where necessary maintain the required eighteen -inch (18") vertical separation
between potable and non -potable water lines.
4. Where necessary maintain the required ten -foot (10') horizontal separation
between potable and non -potable water lines.
5. Submittal of the as -built plans or a letter of certification stating that the project
was installed with substantial accordance to the approved plans.
6. This office has already received a will -serve letters from the City of
Rexburg's Water and Wastewater Systems for the increased loads and
demands of the whole Planned residential development, satisfying that
requirement.
This approval is for the system design only. We will give final approval after it is
established that the system is operating properly. Deviations from the approved plans,
which might result in violations of Idaho Regulations, must be reviewed by this office
before field installation. This office must be kept informed of the scheduling of all
construction phases so that we can make spot inspections as necessary.
This approval will expire on September 25, 2002. If construction is not complete by the
expiration date, plans will need to be resubmitted for approval before further construction
proceeds. Within 30 days after construction, a professional engineer registered with the
state of Idaho must provide this office with as -built plans or a letter of certification
stating that the project was installed with substantial accordance to the approved plans.
A copy of the plans will be kept on file at this office. Please reference DEQ#: 01-06-33
when submitting any other documentation in reference to the Phase A of this Parkside
Planned Unit Development. If you have any questions regarding this letter or if we can
be of any further assistance, please call me at (208) 528-2650.
Sincerely,
Ryan Urbanec,
Water Quality Engineer,
DEQ-IFRO
Cc: Greg Eager, PE, DEQ — IFRO;
Richard Home, D7HD — IFRO;
Craig Hammond, State Plumbing Inspector;
Steve Nielson, 2230 N. University Ave., Provo, UT 84604;
John Millar, PE, City of Rexburg — Engineering Dept., Box 280, Rexburg, ID 83440;
File;