HomeMy WebLinkAboutINSPECTION SEQUENCE - 01-00011 - Eaglewood Apartments - 54 UnitsL^ y ., J. m �. - - ., h ter, ��Rr--. • �� �e ..�.t�r•, ..LR'Y�1.
= - :i _ f.�� �`.lfd••�- a �+�TRr T +••�,+a—. v��w _
CITY OF REX?BURG
BUILDING INSPECTION SEQUENCE
Type of Inspections; For on-site construction, from time to tune she bui�din o#�c�a1 upon � p n notificauon
from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall`
approve that portion of the cOnstmcdOn as completedor shall no�if}r the permit*holder or his agent wherein
same falls tO comply with this cads. � �'�
I . LAYOUT: Lot comers staked, stakingin place for bu"Id'ng, pr�or to excava�ian;
2. FOOTING: Commonly made after Poles or P�e�s aye seg ar �ench�s or basem
excavated., Forms and horizontal re�n�'orcing in place, vertical reinforcing
are
site �r tied in place., g cut and an job
3. FOUNDATION INSPECTION:
The foundation ins
pectian shall inCluded excavations for th��kene,� sIabs intended fnr the
support of bean ng wars, Partitions, strue�tural supports, or equipment and special
requirements for wood foundations. All farms and reinforcing steeI, etc., sh-be in
place.
4-b PLUMBING, MECHANICAL AND ELECTR1CAL*
Rough inspection: Commonly made prior to covering or concealment, before fixtures
are seg, and
5 TRUSS INSPECTION,:pnor to framing inspection..
Inspections of trusses to see they meet shop drawing requirements and that �
installed and braced adequately, ey are
b. FkAME ANDMASONRY INSPECTION.0
Commonly made after the roof, masonry, all framing, firestopping, draftsto ingand
bracing are in place and after the plumbing, mechanical and electdcal rau h iflsp .
are approved. � e�uons
?. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before
any
plasterls applied, yr before wallboard joints and fasteners are taped and finished,
8. FINAL PLUMBING AND HEATING INSPECTION*
All systems in place, fixtures set, ready fog- occupancy
9. FINAL ELEfm*"IIIII`r1,;�4L:
Fixtures and wall covers in place. Directory competed in panel box.
10* SIDEWALK INSP
ECTS:
After forms ars set, prior to placing concrete.
1 � . FINAL INSPECTION:
d
Commonly made after the building is completed and ready for_ occu an
12. OCCUPANCY PERMIT: - P cY .
Issued when, on final inspection, buddi13. ng �s ready to flceupy.
C)THER I�[SPECT�ph�1S:
In addition to the called inspections above, the building department ma ma
,require any other inspec�io�� to ascertain compliance vrri#h this code and other °r
enforced by the building department. mer haws
The Permi� holder or his agent shall past the � ins �c�TIOh� CARD
P on record on the job site in an accessible and conspicuous
place to allow the building official to make the required entries. The record shall
holder unci[ the final inspection has been made and a �-ove maintained by the permit
l have read the above and w�1I cvmply in my requests for inspections by pp e� giving �4 HOUR NOTICE prior for
Electrical: 624-3767 inspections to be made.
Plumbing: 359-3020 ex 3,26 or 313 or 359-3D34 Building: 3.59-3020 ex 32b or 313
n use.
tate: