Loading...
HomeMy WebLinkAboutDRIVEWAY - 01-00002 - Premier Performance - New WarehouseFl E: 3 In DRIVEWAY (SIDEWALK) Line /1 8' on Center Both Ways SECTION \All COMMERCIAL DRIVEWAY SECTION e B COMMERCIAL DRIVEWAY DRIVEWAYS Line (00) 1/2' Preformed Expansion Joint Filler as 1 Transition Slope Back of Walk 50' Maximum 1/2' Preformed ! Spacing In Sidewalk 9 Sidewalk Expansion Joint Filler ! Required Al All Sidewalk 0 I Approaches Back of Walk — 1/2'Preformed Expansion Expansion Joint Filler Utility SlriP xi Utility Strip o of i Driveway I i i i Width Transition Fully Depressed Section Transition ate xs NOTES: - 1. 12' of Granular Borrow (see Standard Specifications DRIVEWAY (UTILITY STRIP) Section 201.03) shall be required under all concrete unless naturally occuring granular base motorial is encountered and opprmed by the Line City Engineer. 3 /4 Rebore Den ty Spaced gar' �R/W Sidewalk 2. All concrete shall be cured with a curing compound as specified in the Standard In Non—Extruded Curb Ulsily Strip See Nola 3 j Specifications or o9 directed 6y the SIO a N Re uiretl �1 4' Fl. t Slope i_� City Engineer. (Materials Section i9 501.07) - - _'-t m - --i� 3. Standard sidewalk width is 5 foot in new construction. Standard slope is 1/4' per 1:1 8�— foot to street. See Note 111 4. Place preformed expansion joint filler at driveway construction and at maximum spacing of 50 feet for new sidewalk /4 Rebar 18' an Center construction. Both Ways 5. 1:12 slope maximum SECTION e B COMMERCIAL DRIVEWAY DRIVEWAYS Line