Loading...
HomeMy WebLinkAboutINSPECTIONS - 01-00001 - Cindy's Specialty Cakes & Silk Floral Shop - RemodelINspECTION CKE r1i TI 'nsPectaon Reques* pec' Rei. 13y ject I I 111spectm- RCM r 0 .."'W Plumb qpLlect. Mech,F- i.` d By Date, � Joe G� � PhOfle No. z?;7�� Permit No. n(, Y -VO A I n .q J Res. L j co m 't ". IN.SnECTE13 IT�,It�[S CONFORM TOL INSPECTOR'S Cq PROVED DWGS�o� EjAPPROVED �.] C.[). (FINAL) ACTION REQ UIRED: Signed Rec +t Ack now hi f e - offic, C.py F- FI R - EJ- I3ISAPPCiVEU ❑ NOT APPLICABLE Ye"O - Job Co, ny EJ N f--7 N/A 1N L-il D NOT N" specfor -ft VUSINF,33 OCC UP ANCY INSPEC (?N 7'g (CV Ride. P1 um b. Inspection Request: Rsr a Proi ect Address Af\ wl. .Ax I 1nspection -lYpe ( Day / Time, -03 Inspector'S Report 0 A ft, Elect. Mee". Ll �'ir� Date Phone No, 35`� permit NO. C-0- (FINAL) N OTAPI"LICABLE" ACTION Signed Rec't A ckn 0,,v 44ged CITY OF JRCXj4 ljr'(:w� 12 Nora, Centler White - C)ffl-ce,Copy Yellou, - jot, Capt FINAL DID NOT INS 111spector T r -If IL..dr 493 4 4 0 Flak - Jlisl)ecf()f 10PY Tyke of Insoections: For on -side construction, from time to time the building official, upon notification from the permit holder or his agent, sham make or cause to be made any necessary inspections and shad ether approve that portion of the construction as completed or shall notify the germit holder or his agent wherein the same fails to comply with this rode, I . LAYOUT: Lot earners staked, staking in pace for building, prior to excavation: 2. FOOTING: Commonly made after pales or piers are sit or trenches or basement areas are excavated. dorms and horizontal reinforcing tied inplace, vertical reinforcing cut and an jai site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection, shall included excavations for thickenedslabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for woad foundations. All forms and reinforcing-, steed, eta,, shall bein place. 4. PLUMBING, MECHANICAL AND ELECTRICAL. laugh insoec. tio n : Commonly made prior to covering or concealment, before fixtures are sed, and prior to framing inspection. S. TRUSS INSPECTION: Inspections of trusses. f. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical Baugh inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau). 7. LATH AND/OR WALLBOARD INSPECTION: Comm'nly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are tapeta and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy _ 11. OCCUPANCY PERMIT: Issued when, on final inspection, buildingis ready to occupy. 12. OTHER INSPECTIONS: In addition to the galled inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other haws enforced by the building department. INSPECTION CARD The permit holder or his agent shall pest the inspection record on the job site in an accessible and conspicuous place to allow the building official to make the required entries. The record �)H- ._ _ _ ._n NOTICE prior for inspections to be made. J J Electrical: 624-3767 Building.- 359-3020 ex 326 or 3.13 Plumbing: 359-3020 ex 326 or 313 or 359-3034 el. Signature: EMWAF"---1 � ��i uc � � �ds� ����� ecu �y �r �� ��rrr�r� r������ uiti tne unai Fnspecrion Was Ween mase arra approved. i have read the above and will comply in my requests dor inspections bv aivina 24 HOUR NOTICE prior for inspections to be made. J J Electrical: 624-3767 Building.- 359-3020 ex 326 or 3.13 Plumbing: 359-3020 ex 326 or 313 or 359-3034 el. Signature: EMWAF"---1 �