HomeMy WebLinkAboutINSPECTIONS - 01-00001 - Cindy's Specialty Cakes & Silk Floral Shop - RemodelINspECTION CKE r1i
TI
'nsPectaon Reques* pec'
Rei. 13y
ject
I I
111spectm-
RCM
r
0
.."'W
Plumb
qpLlect. Mech,F-
i.`
d By
Date, � Joe
G�
�
PhOfle No. z?;7��
Permit No.
n(, Y -VO A I n
.q
J Res. L j co m 't ".
IN.SnECTE13 IT�,It�[S CONFORM TOL INSPECTOR'S Cq
PROVED DWGS�o�
EjAPPROVED
�.] C.[). (FINAL)
ACTION REQ UIRED:
Signed
Rec +t Ack now
hi f e - offic, C.py
F- FI R -
EJ- I3ISAPPCiVEU
❑ NOT APPLICABLE
Ye"O - Job Co,
ny EJ N f--7 N/A
1N
L-il D NOT N"
specfor
-ft
VUSINF,33 OCC
UP
ANCY INSPEC (?N
7'g
(CV
Ride.
P1 um b.
Inspection Request: Rsr
a
Proi ect
Address
Af\
wl.
.Ax
I
1nspection -lYpe
(
Day / Time, -03
Inspector'S Report
0
A
ft,
Elect. Mee". Ll �'ir�
Date
Phone No, 35`�
permit NO.
C-0- (FINAL)
N
OTAPI"LICABLE"
ACTION
Signed
Rec't A ckn 0,,v 44ged
CITY OF JRCXj4
ljr'(:w� 12 Nora, Centler
White - C)ffl-ce,Copy
Yellou, - jot, Capt
FINAL
DID NOT INS
111spector
T r -If
IL..dr
493 4 4 0
Flak - Jlisl)ecf()f
10PY
Tyke of Insoections: For on -side construction, from time to time the building official, upon
notification from the permit holder or his agent, sham make or cause to be made any necessary
inspections and shad ether approve that portion of the construction as completed or shall notify
the germit holder or his agent wherein the same fails to comply with this rode,
I . LAYOUT: Lot earners staked, staking in pace for building, prior to excavation:
2. FOOTING: Commonly made after pales or piers are sit or trenches or basement
areas are excavated. dorms and horizontal reinforcing tied inplace,
vertical reinforcing cut and an jai site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection, shall included excavations for thickenedslabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for woad foundations. All forms and
reinforcing-, steed, eta,, shall bein place.
4. PLUMBING, MECHANICAL AND ELECTRICAL.
laugh insoec. tio n : Commonly made prior to covering or concealment,
before fixtures are sed, and prior to framing inspection.
S. TRUSS INSPECTION:
Inspections of trusses.
f. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
Baugh inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau).
7. LATH AND/OR WALLBOARD INSPECTION:
Comm'nly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
tapeta and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy _
11. OCCUPANCY PERMIT:
Issued when, on final inspection, buildingis ready to occupy.
12. OTHER INSPECTIONS:
In addition to the galled inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other haws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall pest the inspection record on the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
�)H- ._ _ _ ._n
NOTICE prior for inspections to be made. J J
Electrical: 624-3767 Building.- 359-3020 ex 326 or 3.13
Plumbing: 359-3020 ex 326 or 313 or 359-3034
el.
Signature:
EMWAF"---1
�
��i
uc � � �ds� �����
ecu
�y
�r
��
��rrr�r� r������
uiti tne unai
Fnspecrion Was
Ween mase
arra approved.
i
have read
the
above
and
will
comply
in
my requests
dor inspections
bv aivina 24
HOUR
NOTICE prior for inspections to be made. J J
Electrical: 624-3767 Building.- 359-3020 ex 326 or 3.13
Plumbing: 359-3020 ex 326 or 313 or 359-3034
el.
Signature:
EMWAF"---1
�