HomeMy WebLinkAboutRECEIPT - 02-00094 - 707 S 5th W - Two 4-PlexesBuilding Permit Valuation Fees
City of Rexburg (2d8)359-3020
12 North Center Street
Rexburg, 4daha 8340
Value of Construction:
Finished S� �0o
Unfinished 5q Footage
Garage Square Footage
Construction Value Factor
Rate Chart:
Mechanical Val at n
Owner;fMax Cgliard
Building Na z Hyde Park Four-Plexes)
dr: 707 South 5th West
Date: 12J1 912002
BulildinP_rmit Number =
$319,715
01
7*
L::=a
Begin
0
501
21001
25,001
50,001
1001001
5001001
1 X0001001
$01
�PlumbinqPermit
Rate Chart: Residential & Non Commercial
Number of Fixtures 516]
Sprinkler Fee:$18 00
Rate Per Future $8.00
Base Fee $30.00
Rate Chart: Commercial
Cost of Plumbing,:
Rate Chart*
Water & Sewer Permit
$01
Begin
0
20.001
10 0; 0701
200,001
Water Lane Size Inches
1.00 0.75
**Total Meter Farts 1.0-0
Meer Box $70.00
Ring & Lid 2.00
Curb Stop $27.00 3.00
Setter $53.00 4.00
Hookup Fees WateLftte
Digging Permit Fees
Minimum & All Homes $1'ri 00.00
Minimum & All Homes
is of Students) $270.00
.Pts of Students)
;opts (Family H us�n 4
pt (Family Housing)
Water Front Footage $10.00
Sewer Front Footage
Tota I Water & Sewer Perm it Fees
Const. Type
0
0
Total Square
End
500
21000
,000
50,000
100,000
50-01000
110007000
99)9991999
A JResidenTal
Sq Ft Cost
Sq Ft Cost
Foot Cost
Base
23.50
23.50
.
25
391.76
643.75
993.75
3233.75
5608.75
r
"I Building Permit Fee:
Plan Check Fee:
Q05nGoon TY08
Residential
Basement
A�artments
i Garage
Comm
$3191714.5,6..-
$0,00
$0.00
$3,19,714.56
Fees
0.00
0.00
0.00
0.00
24224.1
0.00
0.00
$25224.16
$222.41
Cost SW -d
q Ft
$0.00.
$0.00'
$63.80
01-322.11
1-322.17
Fixture Fee: 448.00
Sprinkler Fee; 18.00
Base Fee: 30.00
Total Plumbing Permit Fee: $496.00 01-322-14
End Base Plus Per Fees
20000 30.00. ni
IW00070 0.00
200000 2230.00 2.0% 1 0.00
99?999)999 323 0.00
1 0.00
Total Plumbing Permit Fee: $0.00 01 -322,14
$11327.79
$13868.00
$2,618.50
Serer Rate
$575.00
$437.5a
$235.Q0
_
Parts"
$182.00
$182.00
$49.62
$39.54
Number of
Bldgs
3
2
Total Water Meter and Parts:
qtudents
Y
DEC 19 2002 M
i
Gir( OF REX69URG ;
otal All Fees
$0.00
$754.00
$0.00
$O_OOL
$0.00
$754-00 25-346.20
$0.00
Apartments
$0.00commer-cial
-347.30
$0-001
Parking
$0.001
-347.30
Pius
Per
(3.00
100
3.05
1(30
14M
1000
10.10
9 Opp
7.00
1000
5.64
1000
4.75
1000
3.65
10[]0
"I Building Permit Fee:
Plan Check Fee:
Q05nGoon TY08
Residential
Basement
A�artments
i Garage
Comm
$3191714.5,6..-
$0,00
$0.00
$3,19,714.56
Fees
0.00
0.00
0.00
0.00
24224.1
0.00
0.00
$25224.16
$222.41
Cost SW -d
q Ft
$0.00.
$0.00'
$63.80
01-322.11
1-322.17
Fixture Fee: 448.00
Sprinkler Fee; 18.00
Base Fee: 30.00
Total Plumbing Permit Fee: $496.00 01-322-14
End Base Plus Per Fees
20000 30.00. ni
IW00070 0.00
200000 2230.00 2.0% 1 0.00
99?999)999 323 0.00
1 0.00
Total Plumbing Permit Fee: $0.00 01 -322,14
$11327.79
$13868.00
$2,618.50
Serer Rate
$575.00
$437.5a
$235.Q0
_
Parts"
$182.00
$182.00
$49.62
$39.54
Number of
Bldgs
3
2
Total Water Meter and Parts:
qtudents
Y
DEC 19 2002 M
i
Gir( OF REX69URG ;
otal All Fees
$0.00
$754.00
$0.00
$O_OOL
$0.00
$754-00 25-346.20
$0.00
-346.30
$0.00
-347.30
$0.00
-3463
$0.00
-347.30
$3x400,00
-346.30
$1,880,00
-347.30
$17460-00
3-346.42
$1,460-0035-347.42
9
$1118%X6
NUMBER 1CONSTRUCTION TYPES
I Residenfial-Wood Frame'
2 Residential -Masonry
3 Basement -Semi Finished
4 Basement -Unfinished
5 Apartments -Wood frame
S Apartments -Masonry
7 Private Garage -Wood Frame
$ Private Garage -Masonry
9 Commercial
10 Commercial Parking
W
Price
$22.16
$0.75
$D,25
$0.65
$14-25
$4.00
$1.52
Const o n Cost Factor
Factor A (Residential, ommer i i
Factor B (Mini Warehouse)
Factor (shell on1v b ildfna)
Quantity
DescOrpition
Two Inch Meter
CF31-77 Brz Mtr Flange
518X2-1/4 Mtr Flange Bolt
5/8 Meter Flange Nut
2x1 Gasket
Three Inch Meter
Std C1 Comp Fringe FiSl
Ziac Pled Hex F301t & Nut Kit
3xi/8 Flg Ring RR Gasket
COST
$67.30
$75.70
°20.10
$14.60
$63-80
$72.40
$24.30
$74.10-1
$38.?0
0.87
Price
$44.32
$3.0U
$1.00
$1.30
$49.62
RIP �.
C
M4
0
c
cr
40
s
0
0
6
0
m
(A
M9
IP
0CL
X
Z
Cl
:3
vp
wi
12P
4>r
®rp!
�llp
l4w
m
7-
Li.
m
ti)
d i�
41 1
ti
19
I
%Imp -