HomeMy WebLinkAboutRECEIPT - 02-00074 - 474 W 5th S - 4-Plex AdditionBuilding Permit Valuation fees
City of Rexburg (208 369-3020
1 1
12 North Center Street
Ruburg, MAN H3440
Value of Construction:
finished Sq Footage
Unfinished Sq Footage
Garage Square Footage
Construction Value Factor
Rate Chart:
Mechanical Valuation
Qwnm.Preston G. Deh
�YII�i09 fI��1Gi�G�IdC�tial i p Fill In
Address;474 West 5th South
Baie:l��il 9/2002
Building Permit Number
$1221113'
2,200
0
0
Begin
0
501
001
25,001
5010,01
1001001
500,001
11000:001
$01
PlumbincPermit
Rate Chart: Residential & Non Commercial
Number of Fires
Sprinkler Fee- $18.0v
Rate Per Fixture $8.00
Base Fee $30.00
Rate Chert: Commercial
Cost of Plumbing:
Rate Chart:
E $01
Begin.
0
0t1
1 00)001
200,001
Water & Sewer Permit
Water Line Size
1.00
"Total Meter Parts
Meter Box $70.00
Ring & Lid$32-00
Curb Stop $27.00
Setter $53.00
I n ches
0.75
1.00
2.00
3.00
4.00
Hookup Fees Water Rats
Digging Permit Fees
Minimum & All Homes $17100.00
Minimum All Homes
pt of Students) $270.00
pt of Students)
Apt (Family Housing) $425.00
pt (Family Housing)
Water Front Footage $10.00
Sewer Front Footage
Total 'Fater & Surer Pennit PennFees
Coast. T
5Si Ft
A
Cost
0 Sq Ft Cost
Ft Cost
Total Square Foot Cost
End Base
Residentaf
or
0.00 ApartmqW
10
$0.00Commercial
$0.Parking
$0.1
Pius Per
COMWU607pt
Des'[ en�i��
Baseme�l
Apa�m en#s
Garage
Commercial
$0.00
$0.00
$112911 1R0,
Fees
500
23.50
0.00
100
0.00
21000
23.50
3,05
100
0.00
253000
69.25
14.00
1000
0.00
50,000
391-75
10.10
1000
0.00
1001000
643.75
7.00
1000
0.00
5007000
993.75
5.60
1 000
1)117.68
110007000
3233.75
4.75
1000
0.00
99, 999,999
5608.75
3.65
1000
0.00
End
201000
100$000
200000
99,9999999
Meter
$125.00
$195.0{3
$1,327.79
$1,863.00
$2,613.50
Sewer Rate
$437.5(3
$1
Cf
Number
Total Building Permit Fees
Plan hecFee:
Fixe Fee:
1 Spnnkler Fee-,
Base Fee-,
Total Plumbing Permit Fee
Base
30.00
630.00
2230.00
3230.00
$4.9.62
$39.54
Plus
Per
10%
1
Z0%
3-347.30
1.0%
34-346.30
�
0.5%
-347,30
Total Plumb -Ing Permit Fee!
Number of
Bldgs
5
1
Total Water Meter and Parts.
Students
6
6
� 11
RG
Units
1 All Fees:
1 �1 17.58
$111-76
160.00
18.00
30.00
$208.00
Fees
0.00
0.00
0.00
0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$1)700.00
$0.00
$0.00
$0.00
$29077.00
$3,514.34
Cost Sq Ft
01-322.11
1-322.1
01-322.14
01-322.14
5-346.20
-346.30
35-347.30
3-346.30
3-347.30
34-346.30
-347,30
34-346.42
3-347.42
UUDIQ log.u fV011
P-.:: � :
'tResidential Woad Frame
2dillo'mup[O�mi
Residential-Masonry
ripil rd
5
Apaftments-Wood ,game
6 Apartmenfis-Masanry
7 Private Garage -Wood Frame
S Private Garage -Masonry
9 Commercial
iii Commercial Parking
A Construction Cosi Factor
Factor = A (Residential, Commercial)
Factor = B {Mini Warehouse)
Factor = C (Shell only building)
$67.30
$75.70
wA
$63.80
$72,40
$24.30i
$27.401
$74.70
$36.70
A
Price
Quantity
Descripi#ion
Pace
Two Inch Meter
$22.76
2
CF31-77 Brz Mtr Flanges
$44-32
$0.75
4
5!8X2-114 Mtr Range Bali
$3.D0
$4.25
4
518 Meter Mange Nut
$1.D0
$0.65
2
2x1l8 Gasket
$9.30
Three Inch Meter
$14.25 2 Std C1 Comp Flange F/Steel $28.50
1,52 2 3A/8 Fig Ring RR. Gasket $3.04
$39.5+4
x
K
Y
I
Ll
4
85519
m!
=1
I
(n
M -Rb -
0
04%
3
:3
ca
I
0
0
lb
vo
(n
N
CD
J>
maq
m
70
n
m
we
I
A
V V
Flo
0
m
0
to
m!
=1
I
(n
M -Rb -
0
04%
3
:3
ca
I
0
0
lb
vo
(n
N
CD
J>
maq
m
70
n
m
we
I
A
V V
Flo