HomeMy WebLinkAboutRECEIPTS - 02-00083 - University Courtyard - 6 Buildings (90 Units)Building Permit Valuation Fees
Owner: Randy Bird Construction Type Cost Sq Ft
:City of Rexburg (208)359-3020 Building Naas: University Court Yard
id nt
l
$0.00
.12 North Center Str5
Rexburg, ISo 83440 d 2nd East Basement
Date: 1112712002 Apartments $63.80
BuildingPermit Numbed ()S7
Garage $16.60
Value of Construction: $2,377)877 -Const. Type A Residential or
F'jn'jshed Sq Footage -.,42-T,840 5 Sq Ft Cost = 7,7 7 T 0 4 -
Commercial $0.00
Unfinished Sq Footage $0.00 Apartments $2137
0 0 S Ft Cost = $0.00 Commercial $0.00
Parage Square Footage -0 7 Sq Ft Cost
$0.00 ParkConstwGtlon Value Factor 8 Total ing
-
$2,377587 7004
Rate Chart: 0 End Base Plus r Fees
23,50 0.00 100 23.50
501 21000 23.50 3.05 100 0.00
2) 001 25X000 69.25 14.00 1000
25t001 5D,1000 391-75 10.10 1000
i
00
50;001 1 OOPOOO 643.75 7..00 1000
.
00
p 500,000 993.75 5.60 1000 0.00
500,001 1,0005000 3233:75 4.75
130001001 9979991999 5608.75 3.65
Tota! Building Permit Fee:lee 01-322.11
Fran Check Fees f� �� .� 1-322.1
Plumbing Permit
Rate Chart: Residential & Non Commercial
Number of Fixtures
Sprinkler Fee: $18.00 6 Sprinkler Fee: 108.00
Rate Per Fixture $8.00 Base Fee:
,Base Fee $30.00 30.,00
Total Plum ing Pit Fee: ... $3,018-00 01-322-14
Rate Chart: Commercial
Cost of Plumbing: 0
Begin End Base Plus Per
:Rate Chart: 0 20YO00 30.00 3.0% Fees
20,001 1009000 630.00 2.0%
1001001 200 0 % .
00
200 ,.001 00
jf .
3230.00 , ! i� 0400
Water & Sewer Permit Total Plumbing Permit Fee: $0.00 10 1 - a22.1 4
Water Line Size Inches
1.00 0.75
1.00
Meter Box $70.00
Ring & Lid $32.00 2.00
Curb Stop $27.00 3.00
Setter $53.00 4..00
Hookup Fees Water Rate
Digging Permit Fess
Minimum & All Homes $1,100.00
Minimum & All Homes
Apts (# of Students) $270.00
Apts (# of Students)
Reis (Family Housing) $425.0
Apts (Family Hosing)
Water front Footage $10.44
Sewer Front Footage
Tota! Water & Sewer Permit. Fees
Meter
$125.00
$195M
1 f327.79
$19868.00
$2,618.50
Lever F
,..�At
Parts**
$182.00
$182.00
Number of
Bldgs
Total Water Miter and PaR7.
Students
s
$431.50 g
$235.40
�r 4 2c1t;r
or
�
ID
0
0
0
90
90
0
0
$0.00
$2,262.00
$0.00
$0.00
$o,00
$29262.00 25-346-20
.
34_346.30
$0.00
-347.30
0.0
-346.30
.i35-347.30
$381250-100
-346.30
$21,150-00
-347.30
$0.00
-346.42
$0.00
-34 7.42
$619662.00
Tgtal All Fees: $76,40T.6"5
4D tcf- °"
r
M -
Logo
NUMBER 1CONSTRUCTION TYPES
1 Resid-ential-Wood Frame
Residential -Masonry
Basement -Semi Finished
Basement- U nfinished
Apartments -Woo Frame
6 Apartments -Masonry
7 Private Garage -Car Part
8 Private Garage -Masonry
9 Commercial
10 lCommercial Parking
A Manstructian Cost Factor
Factor = A (Residenfial, Commercial
Factor = B (Mini Warehouse)
Factor = C (Shell oniv building)
COST
$72.40
516.60
$27.40
1 $74.T0i
0,87
191
E
Price
Quantity
Descripition
Price
Two Tach Meter
$22.16CF
31-77 r tr Flange
$44.32
$0.75
4
5/8X2-1/4 tr Flange Bolt
$3.00
$0.25
4
5/8 Meter Flange Nub
$1,00
2x1 t
$1.30
$49.62
Three Inch Meter
$14.25
2Std
C1 Comp Flange F/Steel
$28.50
$4.00
2
ZincPJtd Hey Rolt & Nut Kit
$8.00
$1.52
2
3x1/8 Fig Ring RR Gasket
$104
$39-54
BuildingPermit Val n Fees Owner: Univers' Curt Yard
(REBILL)ntruon Type Cost Ft
C c
f Rexburg (208)359-31.1 Building Mame: Apartment Res[dential $67.30
12 North Center Street Address: 455 South 2nd East
Rexburg, Idah,o83440
Date:Basement' $14.60
eats $0.00
BuildingPermitNumberR-02-12-05Garage $24,30
Vluae
of Construction: 0 Const. Type residential or Com menial $0.00
Finished Footage 0 Sq i=t Cost $0.00 Apartments $0.00
Unfinished Sq Footage 0 4 Sq Ft Cost $0.00, Commercial $0.00
Garage Square Footage 0 7 Sq Ft Cost = ±$0.00 Parkin $0.00
_
S*q'U'_ir_e__�oot Cost $0.00 $0.00
Construction Value Factor 87% Total
Begin End Base Plus Fair Fees
Rate Chart: 0 600 23.50 0.00 100 0,00.
1 3000 : 23,50 . 100 0.00
2P001, 251000 69.25 14.00 1 000 0.00.
-
fool 501000 391.75 10.10 10001 0.00.
50,001 100,000 643, 1 000 0.00
100 lool 500;000 993.75 5.60 1000 0.00
5007001 1 TOOO)OOO 32,33.75 4.75 1000: 0.00
1100010011 99 9995999 5608.75 3.65 1000. 0.001
Mechanical Valuation Total Building
Permit Feet
�.
Plan Check F
$0.00 0 1-322.1
Plumbing Permit
Rate Chart. Residential Non Commercial Number
Number of Fixtures 0 Fixture Fee:; 0.00
SprinklerFee- 18,00
$ 0 rinl Sprinkler- Fee: x.00
-
Rate Per Fixture $8.00 Base Fee. 0,00
Base Fee $30.00 Tom] Plumbing Pennit Fee: $0 F
00 01 -322111.14
Cost of Plumbing: $0
Begin- End Base Plus Per Fees
Rate Chart: Commercial 0, 20,000 30.00 3.0% 1 0.00
20,001 1005000 630.00 2.0% 0.00
1 Wool 2007000 2230.00 1.0%0.00
_ -
2003001 }999 }999 323,0 h 0.i Jf I0.00
Total Plumbin- P rrr it 01-322.14
Water & Sewer Permit
Number of 2 Meter
'mater Line Size Inches Meter Parts** misters Parts***
2.00 0.75 $125.0'0 $182.00 0.00
.**Total Aster Parts 1.00 $195.00 $182.00262.0
Meter Box $70.0
$0.00
Ring & Ud $32.00 2.00 1 $11327.79 $4 .62 3 $0._0__0 $41132.23
-
u rb Stop X27.00 3.00 1 2868.0$39.54 0. $0.00
Setter 4.00 $2,618.50
00
Angle Stip $82.33 2,00 $82.33
-
-
***2" Elbow .0$36.25 0
'
-
T taI Water Mete r and Pam: 'I870.23 25-346.20
Hookup Fees Water Rate Sewer Rate Students
Arms Units
Digging Permit Fees
Minimum &AH Ho 1 x 100.0 _
$0.00 4 346.30
Minimum & All Homes $575111.00.
7.30
lApts of Students) $270.00
-.
30
pt of Students) $437.50
$0.00 -347.30
opts (Family Housing) $425.00
pt (Family Hou in $23500
Water Front F oot $12P $500.00 0.00
Sewer Front Footage $12.00 $500.000.00 0
. _ 347.42
Total .tr & Seger Permit Feet
IMPACTFEES P POLIO E FIRE FD- CODES .= (SFDMFD,DD,NR)
SINGLE FAMILY (per Unit) $70797 $158.11 $184.61 $0.000.0 -355.00
MULTIPLEFAMILY (Per Unit) 1 . i �.00
.1$0.00 07-355-00
DORMITORY DWELLING (Pei' Unit) $844.8r5 _ 13.54
$69-43'.. $0.00
jF�'y�,. �j
NO IDENTI L(Per 1,000 Sq Ft) $0.00 $82.20 $35.73
$0111,00 0 $0.00 IMPACT FEES
Emotive October 03, 2003 Tots, I Al I Fees:
}
WAlb
a # w
■ t
i ■ a
i ■ j
4
� E 4
f � +
N
0
0
n
I l
f
6
r�
3
m
i
}
WAlb
a # w
■ t
i ■ a
i ■ j
4
� E 4
f � +
N
0
0
n
I l
f
6
r�
3
m