HomeMy WebLinkAboutDOCS - 02-00074 - Legacy Cove Apartments - Bldg #9BUILDING INSPECTION SEQUENCEType of InspectJions- For �n-site constructivn, from firne to time the building flfificiai, upon
notification from the permit balder or his agent, shatl make yr pause to be made any necessary
inspections and shatl either approve that portion of the construction as completed or shall noti
tie permit holder or his agent wherein the same fails to comply with this code. y
� .
LAYOUT: Lot corners staked, staking in place for building, prior to excavation.
2. FOOTING: Commonly nnade after poles or piers are set or trenches or basement
areas are excavated. farms and horizontal reinforcing tied in place,
vertical reinforcing cut and on jab site or tied in place.
3. FOUNDATION INSPECTION:
The foundation 'inspection shah included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. ASI forms and
reinforcing steel-, etc., shall be in place,
4. PLUMBING, M`E(IODN HAN I CAL ASND ELECTRICAL.-
Rough
inspection-- Commonly made prior is covering or concealment,
before fixtures are sed, and prior to framing inspection.
5. TRUSS INSPECTION:
Ins.pections of trusses.
6. FRAME INSPECTION.:0
Com.monly made after the roof, all framing, firestopping, draftstopping and
bracing' are in place and after the plumbing, mechanicsl and electrical
rough inspections are approved. (Elec",tr�cal inspection performed through
Stade of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commbnly made after all lathing and/or wallboard interior is in place, but
before an7 yplas#er is applied, or b fo vaard join s and fasteners are
taped ana finished.
$. FINAL PLUMBING AND HEATING Irgs EC ONE-
ASI systems in place, fixtures sed, ready for occupancy
9. SIDEWALK INSPECTIONS:
After farms are sit, prior to placing concrete.
10. FINAL INSPECTION:
71.
Commonly made after the building is completed and ready for occupancy .
OCCiJPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other favus enforced bv the building department.
The permit holder or h;s aged shall
INSPECTION CARD e inspection record on the ��� side in an accessibly
and conspicuous place �� al)�aw the �L���di�g official to make the required entries. The record
shah be maintained by the permit holder un��� the fina-1 in�pectior� has been made and a rived.
1 have read the above and will c�arnpiy in my requests dor inspectionc.3 by �PI�OTICE prior far inspectior�s to be made. 24 HOUR
Electrical-: 624-376i wilding: 359-3020 ex 326 o� 313
Piurnbing: .35J-3020 ex 326 or 313 or X59 -3Q34
Signature: Date:
0
I
n� a���u�� r�q�ire� IL I
��
LW
Plot Plan with dimensions
2. Floor plan
3. Foundation plan
4. All buil
ding 0 elevations
ia
r1 UtIA
5.. Section showing construction details *and. stairs if any
6. Truss details and calculations
a. 35# snow load
b. calculated for 80 m.p.h.
C. must be approved before
framing inspection can be
0
accomplished
76 Floor joist details
I
I
FA
7
0
li
Mbb
J
kt
FA
7
0
li
Mbb
J
ft
k
law", 3mllr__
or
0
4
4r
Fa
JjJ
X
I , 1 7, �—r q — .
3 .-Pie
777
Pi
75
11 L . 0
tie
—lye
mob.
7z
o
o r
L
All:
2. LCL77
%E
MEMENOWL
%M
tZ�XA�K P. I mft