HomeMy WebLinkAboutINSPECTIONS - 02-00070 - Rocky Mountain Way Townhomes - 6-PlexIN'SPECTION'TICKET ;
❑ Bldg. ❑ Plumb.
❑ Elect. ❑ Mech. ❑ Fire
Lam■-=�fi
INSPECTED ITEMS CONFORM TO A
iNS,PECTDR'S ACTIQh1
EJ APPRO��'�
0 C.fl. (FINAL)
ACTION REQUIRED:
Signed
cqt Acknowledged
White - ffice Copy
F -FIR` O0
— — %—r . i�t-1 Lo �A, (_j
)�HSAPPROVE-[)
C,' I�'OT APPLICABLE
YellO , Job Co
-= W.L_j1III.
IL It
FINAL
DID NOT INSPECT
Flak'- In Peclor`
4-4
Inspector
INSPECTION TICKET
fllsPr-ction Request:Recd BY
Req. Bv
Project
Address
Inspection l'ype
Dai /Tiline Rei.
Plumb.
❑ Elect. ❑ Mech. ❑
Fire
-`Date /Z�Z
_ Phone No. 1
P01-111if No.
0
Inspector's Repot
Res. f�
� �c A2c c
-'moo
INSf'ECTEU ITEMS CC)I11FC}RM To AI'I'IiOVED Dw
fNSPECI'UI�'S UN
GS
APPROVED
C� C -d- (FINAL)
ACTION REQUIRED:
tined _
Ackflo�vledged
While + tIV? Copy
F-FIR-CO03.
U DISAPPROVED
El NOT APPLICABLE
Fell
fob
m
f7j Y F _� IV
U [-;INkL
D IIID NOT IIVSPJ�CT
N/A
Irispector
ATSPECTION TICKET
❑
B IdJ ❑ Elect.
Inmectian Request: Recd By
Req_ By
P1
Med-
Address
Inspection Type
Day /Thne Ren -
Inspector's Report
In
o
Date
Phone No.
Per�r�it No.
ze) -3/
RAS.
INSPECTEDITF
Ik �f _
APPROVF
IPT . 4
JUN
Le-7`-,APPR0Vjq)
0 C-0. FINE
,�L)
ACTION REQUIRED:
EJ DISAPPROVED
tVDTAPPLICABLE
l necj
.ec t Ac .Me ged
White - oftice C.,
cc)Copy
Mech.4
Fire
�-moi-oL
�_--l 1-7INAL
D DID NOT INSPECT
Inspector
INSPECTIpN
TICKET
Bldg. (]
Plumb. ❑Elect. Mech.
Fire
InsPeetion Request: Rec'd B(
Req. By
Q.
Pt -t)
jet 1- �-,r V �.: �i�'1._ � . t i
Address��
join
Inspect* Type
Day II���le
Req.
Irrspectol-'S Repalt
Date
110,
Ph No.
INSPECTED ITEMS CU1F�RgTr �IA O APPROVED DWGS
INSPECTOR 1 S ACTION
IFPROVED
�-] C.O. (FIXAL}
ACTION REQUIRED:
Signe(I
Rect Acknotvj,,f%1,g"
White - Office COPY
F-F1,R,C003
DISAPPROVEI)
L�j NOT APPLICABLE
Yellow clo'_Np�y
Collin].
j FfNA
L
0 DID NOT INSPECT
Ire spec too
Pink. - InSpeclor's C,.P,
INSPECTION TIC KET
Bldg. ❑ Plumb. ❑ Elect. ❑
Mech. ❑ Fire
InsPection Request:9Red By
Rei. B
y Ile
�
Project
13A - j
Inspection Typ,
Day /Time, Rei,
"Pecto"s Repoll
y
4
R es.
INSPECTED I7EM �R
S CONN?FORV 0 R�M�7
IN FI
ACTION
X/IPPROVED
L'C-0- (FINAL)
ACTION REQUIRED:
Signed
Roct Ack-flOwle0ged
Chile - ffice Copy
F -FI R -O0
�? vjSAPPRavLn
NOT APPLICABLE
e"O - Job Cop -
Date Tr .
V130ne No,
0
Permit No.
}
9
Comm.
NY
FJ FINAL
U DID NOT INSPECT
Inspector
Pink -
ln'Plr' Copy
4
mum
Bldg. Plumb.
Inspection Request: Rev'd BY
Req. BY
r
Project-,
Address
Inspection Type
Lay /Tilne Req -
Inspector's RI-epoll
Z5?,
INSPECTEDIT �
y
PPR
L'J C- 0- (FINAL)
ACTION REQUIRED:
Rei1t Acknowledged
While office Copy
F-FIR-CO03
N
9h
Elect. ❑ Mech. ❑ Fire
Date
Phone No.
0. }r
i
r Ides.
m.
ID�� I'1'i i is
Mile.
❑ INQT APPLICA.
Zml
eHo -,fob C00Y
t.
n,- t-1 n,
4-_.
0 N/A
DID No SPF
,CT
1-
Into for
i ai in Pe tor's Copy
CITY OF REXBURG
BUILDING INSPECTION SEQUENGE
Type of Inspections: dor on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shad notify
the permit holder or his agent wherein the same flails to comply with this code.
1. LAYUUt:
Lot corners
staKed, staking in place for owaing, prior to
excavation:
2.
FOOTING:
Commonly
made after
Doles or niers are set or trenches
or basement
r r 1
areas are excaWated. Forms and horlZrontal reinforcing tied in place,
vertical reinforcing cut and on jab site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection Ghali included excavations for thickened slab
intended for the support of bearing wars, partitions, structural supports, or
equipment and special requirements for wood foundations. 'All farms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: CoMmonly made Prior to covering or concealment,.
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
inspections of trusses.
6., FRANCE INSPECTION:
Commonly made after the rood, all framing, firestopping, draftstopping and
bracing. are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing andlor wallboard interior is in place} but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly m
11. OCCUPANCY PERMIT:
Issued when,
12. OTHER INSPECTIONS:
ode after the bU11ding is completed and ready for occupancy .
on final inspection, building is ready to occupy.
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shah posh theinspection record on the job site in an accessible
and conspicuous place to allow the building official to mike the required entries. The record
shall bem�intained by the permit holder antil the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: G24-3767 Building: 359w3020 ex 326 or 313
Plumbing: 359-3Q20 ex 326 or 313 or 359-3Q34
Signature:
Date:{'r �-