HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 5 - 19-00739 - The Grove at Thomson Farms PH2 - Hazelwood - 20 Units Bld 6Inspection Date:
07/16/2021
File Name:
20001CP07162021YK
Inspector's Signature:Inspector's Name:
Yannick Kabwika
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/16/2021
345b909c5362d83b-1626444897042 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
The Grove
Start Time:
05:30 AM
Client:
Stillwater Equity Partners
Contractor:
Kelvin Virgin Construction
End Time:
08:15 AM
Inspection Type(s):
Concrete Placement
Location(s):
South sidewalk of buildings 6 and 5
Observations/ Remarks:
I observed that approximately 3/4 of the sidewalk on south side of building 6 was already poured.
They did it yesterday without us. The results were reported to both the concrete contractor and the
concrete truck driver.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/16/2021
File Name:
20001CP07162021YK
Inspector's Signature:Inspector's Name:
Yannick Kabwika
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/16/2021
345b909c5362d83b-1626444897042 2
Inspection Date:
07/16/2021
File Name:
20001CP07162021YK
Inspector's Signature:Inspector's Name:
Yannick Kabwika
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/16/2021
345b909c5362d83b-1626444897042 3