Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION 5 - 19-00739 - The Grove at Thomson Farms PH2 - Hazelwood - 20 Units Bld 6Inspection Date: 07/16/2021 File Name: 20001CP07162021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/16/2021 345b909c5362d83b-1626444897042 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: The Grove Start Time: 05:30 AM Client: Stillwater Equity Partners Contractor: Kelvin Virgin Construction End Time: 08:15 AM Inspection Type(s): Concrete Placement Location(s): South sidewalk of buildings 6 and 5 Observations/ Remarks: I observed that approximately 3/4 of the sidewalk on south side of building 6 was already poured. They did it yesterday without us. The results were reported to both the concrete contractor and the concrete truck driver. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/16/2021 File Name: 20001CP07162021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/16/2021 345b909c5362d83b-1626444897042 2 Inspection Date: 07/16/2021 File Name: 20001CP07162021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/16/2021 345b909c5362d83b-1626444897042 3