HomeMy WebLinkAboutSPECIAL INSPECTION 15 - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/15/2021
File Name:
21020DFR07152021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/16/2021
B9ECA0DD-C42B-4B64-8AD5-B36B2A47C772 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
12:30 PM
Client:
Madison School District
Contractor:
ML Masonry
End Time:
02:30 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Interior restroom partition walls.
Observations/ Remarks:
Arrived on site around 1:00 PM and inspected masonry reinforcement rebar. Reinforcement was
observed to make specifications for size, grade, spacing, lap length, and placement. Rebar inspection
observations were reported to Eric from ML masonry. Masonry Grout arrived on site around 1:15 PM
and was placed according to specification with vibrations every vertical rebar. Excess grout was placed
in the gymnasium partition walls. Left site around 2:15 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/15/2021
File Name:
21020DFR07152021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/16/2021
B9ECA0DD-C42B-4B64-8AD5-B36B2A47C772 2