Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 15 - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/15/2021 File Name: 21020DFR07152021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/16/2021 B9ECA0DD-C42B-4B64-8AD5-B36B2A47C772 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry End Time: 02:30 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Interior restroom partition walls. Observations/ Remarks: Arrived on site around 1:00 PM and inspected masonry reinforcement rebar. Reinforcement was observed to make specifications for size, grade, spacing, lap length, and placement. Rebar inspection observations were reported to Eric from ML masonry. Masonry Grout arrived on site around 1:15 PM and was placed according to specification with vibrations every vertical rebar. Excess grout was placed in the gymnasium partition walls. Left site around 2:15 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/15/2021 File Name: 21020DFR07152021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/16/2021 B9ECA0DD-C42B-4B64-8AD5-B36B2A47C772 2