Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00068 - 890 Andrews Pl - 4-PlexCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type, of Inspections: For on-site constructian, from time to time the building official, upon notification from the permit holder or his agent, shall make or c. se to be made any necessary inspe.c.fions and shall either approve portiontha# of the, construction as completed or shad notify thenermit folder or his agent wherein the same faits to comply with thiscode. 1. LAYOUT: Lot corners staked, Making in piaci dor buildEng, prior to excavation; 2. FOOTING-. Commonly made after poles or piers are sed or trenches or basement areas are excavated. Formsand horizontal reinforcing tied in place, Vertical reinforcing cut and on job site or tied in r),'ace. 3. FOUNDATION INSPFCTION: 4. 511 6. 7. i 9'. ItH 11. 12. The foundation inSDection shall included excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or eau�0 pment and soecial requirements for wood foundations. All forms and reinfordina steel, etc., shill he in place_ PLUMBING, MECHANICAL AND ELECTRICAL: Rough inSDection.: Commonly made prior to covering or cancealment, iDerare ixtures are set, and prior to framing inspection. TRUSS INSPECTION.il Inspections of trusses. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (EIectrical inspection performed through Stade of Idaho Electrical Bureau) LATH ANL71C7R WALLBOARD INSPECTION Commonly made after all lathing and/or wallboard inferior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. FINAL INSPECTION: Commonly made after the building is rnmnlptad and ,Anrl„ r.,. ryr, OCCUPANCY PERMIT: j UPCA"Lfy . Issued when, on final inspection, building is ready ta� occupy. �JTH ER 1 f"SPECTIC][VS i In addition to the called inspections above, the building department may maks or require any other inspections to ascertain compfiance with this code and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall post the in-soectionprecord on the job site in an accessible and conspicuous pace to allow the k�uild�ng official to make the required entries. The record shall be maintained by tie permi# holder until the final inSIDection has been made and approved.1 have read the above and will comply in my requests for'insneGfions bv giving 24 HOUR NOT10E prior for inspections to be made. Electrical.- X24-3767 Building: 355-3020 ex 326 or 313 Plumbing-. 359-3Q20 ex 326 or 313 or 359-3034 Signature: Date: