Loading...
HomeMy WebLinkAboutINSPECTIONS - 02-00065 - Bowen Student Housing - RemodelINSPECrirlON TICKET �C`213 $ldg. ❑ Plumb. ❑ Elect. ❑ Mech. Fire 9 0 i n El DISAPPROVED D NOT APPLICA BeetAckrj()�vued While , off, e COPY YellO - Job LJ N Lf ,1 N U FINA L U DID NQ7' Ih'SPECT Ire Lt r CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections., For on-site construction, from time to time the building official, upon notification from the permit holder or his a�en#, shall mike or cause to be made any necessary I nspections and sha!l either approve that portion of the construction as completed or shad notify the permit holder or his agent wherein the Sams fails t0 CUI'1'1ply with this cod�. 1. LAYOUT: Lot corners staked, staking in place for building , prier to excava#ian: 2• FOOTING: Commonly made after pokes or piers are sed or trenches or basement areas are excavated. Forms and honzontal reinforcing tied in place, vertical reinforcing cut and on job site or tied an place. 3. FOUNDATION INSPECTION The foundation inspection shall included excavations for thickened slabs intended for the support of bearing waCls,partitions, structural supports, or equipment and special requirements for wood foundations. 'All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: l inspections of trusses.�..- 6. FRAME INSPECTION: Commonly made after the- road, all framing, firestopping, draftstopp"ng and braying ars in place and after the plumbing, mechanical and electrical rough inspections are approved.. (Electrical inspection performed through State of Idaho Electrical Bureau} 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before waIlE�aard points and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION, All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are sit, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. OCCUPANCY71PERMIT. Issued when, on final inspection, building is ready to occupy. 129 DINSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced by the building department. lNSPEGTIQN CARD The Permit Raider 4r his went shall post the �nspec#ivn record on the job site in an accessible and conspicuous place to allow the building official to mike the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. i have read the above and will comply in my requests dor inspections by giving 24 HOUR NOTICE prior dor inspections to be made. Electrical: 624-3767 Building: 359-3U20 ex 326 or 313 Plumbing: 359-3D20 ex 325 0r 313 or 359-3Q34 Signature0 ., Date: -oz