Loading...
HomeMy WebLinkAboutLETTERS - 02-00063 - BYUI Benson Building - AdditionLloyd Bensen BI'IJ-Id Rexburg, Id 83440 Dear Sir- 3 September 2003 After rev�ew�n� the 199? Uniform Building Code and the Plan� fay the Benson. building I have found that the stairs of the building are not within the limits set by the building code of 7" Maximum rise and all three of the stars in question are not built as drawn in the plans shown on pales A401 and A 402. The 3/8""s variation can only apply to steps that have a maximum rise of 7" as prescribed by the code, .x,11 of these steps are over the 7" limit. I have not seen the change artier that dropped the bottom landing 6"" so I do not know if the architect specified any dimensions to the steps for the change. All three of these steps ars not within the limits of the Cade and are not as drawn on the plans therefore they should be corrected and brought in compliance with the cade and with the plans. Sincerely, Jon Berry Building inspector CL'. .!OCE 0 C - . X A,6 STATE OF IDAHO 3/24/03 Mr. Lloyd Benson Dir. Contract & Construction Sei-vices B-aham Yount UnversIty-1 daho Rexbur ID $3 40 D ear Mr. Benson: P-0, Box 12 North Cefiter Street Rexburg, l d ah o 33440 Phone (208) 359-3020 Fax (202) �SM022 e-mail f c bur � rv.net R, -F. - Benson BuiuldualcFAddition P�ojeci, Center Street .,, an campus, City of Rexburg Idaho Building Permit N,, -o. R-020915 TI -ds letter is pursuant To the receipt of Special Inspection reports, which we had received by FAX last Frio&37 , 21 March 20a3, from your Special Inspection firm, Materials Testinc, & Inspectionwhose office is �n Idaho Falls. Additionally, I received a call from that firm's Manacyer, Mr. Dan Kong ca1lino, my attention to the existence of the faxed reports, and also indicatl'na that understand that your contractorhe teras given to , Jacobsen Construction, had caused the removal of the Special Inspectors, and directed that they could not return to the s�tc. To reiterate the position of The City of Rexburg in this mater, if there is no Special Inspection as required under Chapter 17 (Structural Tests and Inspections) ffitemational Bul"Idincy Cade 20d0, the Build'sng Dept. would hold your build' n-cl perm.i to be technically 'in suspension, pending resalution �fthe matter of any on--siie Zack of insp�c�ion. The matte with the building department would be 1"m'ted to that issue. A matter of alleged incompetence oir inadequacy regarding ind'v'dual inspectors or flrr-Is would be o�`intez�est to the Building Off -le -al zn r�rder �o enable qualffication and ,registration review. The issues presented by MTS are phase which are technical ion substance and rather critical m some regards. The items whish ars stated as deficient by special inspection are referred by the Building Department to the Offjee of The, City Entgffiee�,, Mr. Sohn M*11ar, P.E. .11 This afternoon thzs author received a call from Mr.. des Mecham., of your office and he clarified that the issue of continuinc, special inspee�zon a# ih�s site was demonstrated by MT1's inspeciion presencecin side as we spoke;. Subsequently this author spoke to Mr. Sim Mossy Supp. For Tac�bserl, an+d he +^ -f that a.�y uz�.dersta�adzng by Materials Testm'a and Tnspection t1_1 a' e1��er their firm, oz any of their inspectors was no longer allowed on site was a mxsund�erstand�ng. In the event that tie znspecio�s had begin removed undez IN ndx+*or�s m19111 fiend themselves to an reporting directlto appearance of retaliatory action, their Cede. y the Build��� �fficia� �vould be allavvable,- if not xe u���dby, the,q 0 In regard to the teclimocal mait��s, Mr..�o�n ��Ilar� �.E., The City of Rexburg Engineer requires that correct, ��ons a� all deficiene"es be made io the satisfaction of the Project Engineer o� Record,, and that the enainecr communicate. his satisfaction to Mr. Millar. Also a re-mspect�on is �equ�red by the Code. This author is pleased to report to the City Administration that the interest and response by all part ies was timely and professional, particul. -arty the Uni'versity in addressing the matter. Personally, i thank all of you for your assi,siance. Cordially.,, <-O� %% /__AOr t M ti s ti' For Val Christensen, Building Official, City of Rexburg Cc. Val Christensen John Millar., P.E. .e Stephen Zollinger, Esq. Mr. Dan King, Mgr. MTI OCT -,;1-2003 FRI 03.11 PM P. 01 F), i JCj'HAM YOUNG IV! LKS ITY I D A H 0 October 31. 2003 City of Rexburg Atte: Val Christensen, Building Inspector P.O. Box 280 Rexburg, ID 83440 Re: Welding Inspectians at the Benson Building Decar e l,: As per your request at the 10% of the beam welds in City luncheon on October 23d., use will inspect an additional addition here on the BYU-Idaho campus - the Benson Buflding (The location of these welds to be identified bv the City �enartment.) Also, as part of your repuest, '12M will do IF iinaings to you,. Since Y�' Please lit me know ff you have LloyfBenson F'roject Manager Charles Andersen TQM Consulting of Rexburg Bu-ildi-no, the inspections and submit their any questions or concerns. jV -Y"r Rexburg- ID 83460-8205 ` olze3 496-2460 Fax: 8) 496-2490 mail.hensotilc@byui.edu 10/11'!?003 Lloyd Benson BYU1 Idaho Physical Plant Rexburg, I D 83 4 4 0 .]ear Lloyd,, STATF QF IDAHO wwvr.ci . rexbu rg, id . us J P.O. Box 280 r2 North Cente. r greet Rexburg, l h 83440 Phone (20 3,59-3020 Fax (208) 359-3022 -mail re arg@d.r r . .sj We have received a letter from MTI .in ca�cer�a the special inspections thaLL took place on the Benson Build�ng Project. T have attached a copy of the letter to the back Qf'this docume-al According to this report, there were a large number of deficiencies reported bv the special inspecior that had not been rectified by the cant actor. ►�r e �vii neeia Lo navy you i0juow ui� on each oi the reported de-ficiencies and Drnvide iifi with do cumentat ion furthermore, it would be helpful to Citvy to once main d�s+cuss special uxspections. in general. have a meeting with the University and We could gel together at City Haff for a luncheon meetmg at 1 1 :00 a.m. on Thursday October ?3. Please het me know if the time and day _r 1.. a U L [xiGz;L111g wilt wur& wr trie umversity ani now many attendees to pian f questions please give me a call at .359-3020 ext. 324. Sincerely, Val Christensen Building Official CC: John Millar Jon Berry Stephen Zoger �r. If you have any rLL •. y'tiMATERIALS yTE5TING & ° r INSPECTION _j Envfr gal 'zerAces Val Christensen City of Rexburg P(] Box Z80 Rexburcr ID 83440 Q Geotte::chnicc-ti Engineter'fng PAGE # I OF RE11MION DATE rT B E- 13 6,° 2003 BYUrEN C SA PT . �0 4 Llon Mat.erialsTesting Soec]21 fnsn(mr.tT-nrq V- - _ _ -.. ;. Project;* Beeson Budding Inspector: Troy MciMurtrey Inspection Date : December IG, 20U2 - September 1[i, ?UO3 FINAL STEEL REPORT Oia the above date, our �epresentat4v� per -formed work -,n the referenced project as reported below. This letter is to ce��.fy ��at, in accoi�ance v�r�ti Sec+�o� 1,7 0 of the LTnzform Building bode, �h� proJFnLct specrfica�r.oza as andlor the project scope of s�rv�ce�, Materials Testing and Inspection. e sonne-1 have performed special inspections of the following ztems. Soil Sub Grade Ins f + .itaT t'nReports: 1,9.,,1 14* 1 41 1 r 7 , � , � 1 a 160, -1 _ 1 2 5 106, 1 ' 1081 112.) 11 115 1192 .125 139 #��1495 1507, 9, 154, 1 8; 1 1605 161, 1, 166 1 1707 1- 3 3, 174, IM 182, 1837 184, 186, 188 197.192 and Reinforced Concrete Testing and InspC',etions Rcports.- 3n 4, X1W -7, 597 61 64 67 71, 725 777 82.5 84, 927 9,-3 6;, 77 8:, 10, 11, 13.3 15.,, 17 207 �. , 353 � 12 � 4 157, 1677 1693 171j 19-52 96j 99) 7 144 1457 1482 151.15571 71 , Thr 187 1 190 and 11z I rced MasoaryTesting and Inspections Reports: I 10 120 7 12-D 3. 124, 12 8 and 3 4. �9 of 0 t r t t ci Inspectionsrt , 1 17 1 1 � a ; i 562 163 7 165, 1p, 199 and203. T Fireprok'JI-LiA Uas-ec 4- 1 n3 9 Re- T S `94 19? 5 1 1 1 , 2 n 0, 1 and CAU/ Soils Laboratory Analyses. 698 vs. 15_57.doc. Proctors 50-7-S, 508 -S 5131 -S 514 -S and 585-S -baseci on the inspecrions and test f °sully e ner to ri l its.., construction work 'inspecteddurth referenced rf°d i�r1 ��r��c Fit 1c� _ � a �r�o;� i��� ' tax �T�ormBu��..� �� t except notedbelow: �oj� et plans and specifications,' 0 Rep orts 4 6, /,27 and 47.. No trenue used durfficr place r nt f concrete. 0 Reports 5, 17. ek L on exterior sidef tin cr. ur Yip � � t r =01 -IL �l�ffe c t ( � T * - � directed contractor t 7 iA t AM f r',1' A i to �•' r� r��. � . T Ui � n�Lto x� ori b _ *- _ __. -- lid 1f �--r Row -D. This ar' wpacked wits : - _ _ _ _ __1 T __57 { r tn� erected_ ort6--Inspector ofpicesent before .n � dowel placement operations. said they will callTVITI for terg cr t° approval tO use all the d and for the approval from the Ls-Lructural e r to sh oTten the. lenqthof die stud5. but did not have Raport ; Grout holes ifoo1 not b10c t d. Contractor sed theya � d � � inspector ter � tons t1�y . Report 49. Elever- Dr pit slab f 1x nc ick. Cc r to the,'Pians 1t should .have. bee . nehes thick, 1230 N. Skyline Drive, suiteaIdaho Faffs,ID 83402=FMMM -0 NMI 208 552 _8242 Fax 208 529-6911 -Mall eimti@mti-ici.com 11v'A1w mfi-f , MATERIAL TES NG INSPECTIO, Q Environmental Services o t ec.� h ri i c a 1 E n g I n e e ri n PAGE 4rr 2 OF 2 REV13ION DATE OC70SER 6, 2003 VWT �SERVENRLMEI REPOJRTS-,'�12002 REPORT S�Z'SGOOI NYU SEMS RPT E L] Construction Materil-als Testina Q Soeci.,;f 0 Reports 49, 47, 116, 04 and 07: -Air content and/o_r sluT-pechowe,ve p axe out of .. r_ CO_ED 'PressIve,. S' C119 test repoits lildicatt that the c0ilcic�te Ott Or xcecdei. r j ct I eltL on s . Reports 116 and 132: 3/41nch sm o c th d c) we I s at c oas truc fl I 01PIts wele De t us e. d but -Wffj� rep I ac e d With #4 r e b ar. Reports •and 186: Sub grade M-spections were not perfo=ed or y asphait or side-�vaLk Report 1-5 -1 No RF1 ree 've i -in locauons. e,' d for extension of embed piates and joists wert only welded oia one side. 0 Rep ort 8 3: S turfs were core drilled out, but new stuff were never reinspected. 0 Report 199: Ledger bears on notbin-a at the tnds and roof deck was covered before inspections could be perforTned. Report 1.5)6: Due. to the lase notification for steel -inspection, the beam co_nnectioT2 plate to embed iate welds were covered by fver)roofincy. It wis.,reqtie. ted bv.Jacobsen Con-s-fmction anU-Idaho that we sFm L . 10-ct 04_n1v ?n% c' Vhc,,se -Y�16,ds not perform S UqjI " i, - - MT d-.; d V' - Lnspecaons on aJ1 welds 'as requued by Paxag-raph 6.9 or AWSD1­B1 — 2002 Structural Steel Welding N71 zn Codel welds shall be 'sually inspected and shall be acceptable if the, clIte-ria of T e 6.1 are satisfied' ) N' Report 203: Spector was not nob'fied of work bain-cr puformed and was Unable to * ul-spect the skv bn'dcre bolted connections.. roof deck or any weldincr that was performed." V zl- T2M Insp ec 6 ons YU-1daho stated that he had 6 Llo, d Bens on of do this 1*11-spec uL I C on but NI" caniao-L confLum 3 was constructed 'in accordTance with approved plans and specific ati o ns. See reports for �nformatian. NOTE: M'T1 performed tests and inspections only when scheduled to do so. If you have anv questions co-neemincr this report (rpt2O4.doc), please call on us at (208) 529-8242.0C71 Respectfully submitted, rtted, NiATEI2dAZ.S Yr:S3'ING & INSPECTION INC. Reviewed by : Dan King Eastern Idaho iVanag,.,rer 1-1k ' "riginal signed copy to chent-.BY'U__";ah0 1-U, CC: CTA Ar-chitects, City of Rexburg, Jacobsen Construction A �jiwme Idaho L)rlve, SuiI e - - ----- FaHs, ID 83402 208 052-9-8242 Faax ?08---0-29-6911 E -Mail eirnti@mV-1dcom www. rnti-d corn 2 i At r Ip a ., 834404 Pz 8 -4 0 1` — 186'%0 's -W !w 0. %vo 10/13/03 Val Christensen Building ;Official City of Rexburg 12 North Center Rexburg,ID 83440 E: Benson Building Skybridge Deas Val, Enclosed 'is a copy of the letter I sent to Lloyd Benson Idaho in regards to the Skybn'dge in the new 1 ! u-:111di r J% � r your � �� . �� you h`» ' any �{u jon gas` contact die L /-U0-1 1- .L Z. Thank you Since Bret L. McGowan T21A Consulting _Oo BOX "y 10{3/03 Lloyd Benson Construction Manager BYU Idaho Physical Pian 450 S. Physical Plant way Rexburg, ID 83450-825 RE: Benson Budding - Sicybridge [lean Lloyd, At your request I performed a welding inspection/observation on the already completed 5icybridge 'in the new section of the Benson Building from grid line 2.0 to 3.0 and from G-.9 to the existing building. All phases of the construction for this item could not be observed but approximately 90 °Io of the bolting and welding could be seen. After reviewing the plans, the general contractors daily reports, and the completed work, it is TQM Consulting opinion that all work per -formed is in compliance with plans, specifications, and applicable building. codes. However this observation in no way creates liability for TZM Consulting, nor does it relieve the Independent Testing Agency responsible for the project inspection and the contractor who per -Farmed the work, of their liability for the Benson Building Skybridge being ars accepted structural idem. Sincere} Brei L. McG'owan T2M Consulting 10{3/03 Lloyd Benson Construction Manager BYU Idaho Physical Pian 450 S. Physical Plant way Rexburg, ID 83450-825 RE: Benson Budding - Sicybridge [lean Lloyd, At your request I performed a welding inspection/observation on the already completed 5icybridge 'in the new section of the Benson Building from grid line 2.0 to 3.0 and from G-.9 to the existing building. All phases of the construction for this item could not be observed but approximately 90 °Io of the bolting and welding could be seen. After reviewing the plans, the general contractors daily reports, and the completed work, it is TQM Consulting opinion that all work per -formed is in compliance with plans, specifications, and applicable building. codes. However this observation in no way creates liability for TZM Consulting, nor does it relieve the Independent Testing Agency responsible for the project inspection and the contractor who per -Farmed the work, of their liability for the Benson Building Skybridge being ars accepted structural idem. Sincere} Brei L. McG'owan T2M Consulting 13R1GHAM YOUNG N I E R S 1 T{ I D A H 0 October 3 1, 2003 City of Rexburg Attn: Val Christensen,, Building Inspector P.O. Box 280 Rexburg, ID 83440 Re. Welding Inspections at the Benson Budding W, I sm wear Val-, As per your request at the City luncheon on October 23rd, we will inspect an additional 14% of the beam welds in the Beason Building addition here on the BYU-Idaho campus - (The location of these welds to be identified by the pity of Rexburg Building 1)-epartment_� s��SO, as dart of dour reauesL, T2�. v��i�� da she ��specti�ns a��. �ub��z� ��e�r fi1A"_n1d&.;LrL1Lgs t -e yotl. Please lot �e know if you have an;v qtiest ions or concerns. Since LloyfBenson PrOject Manager Cc: Charles Andersen T2M Consulting s�I " Phone. (208) 496-2460 ° (208) 496-2490 `ail: bensonk@byul.edu P. 01 0 i:isPn JMML — P1. EMM, Btu aft iacobw, Conaftucdm Company 3131 WestIO 10 ' Sowth SSR I ske Cky, UWh 84119 I► i f { _ A dudi f;H f ti Iny ■_ i # by ° F The SRI FGwv_ of the anchors 1v vuffx*j to w wisna ta ioaft MMONA a - to #� * i to T* Oftan, ___ M%Wng to swim Ths 04 bw ftw ft L�_AT PUMMig to to* Up ft #Wb &W ft to a i1vindift licioicuft. I . a Mafia unlOW this to ft,w" -0" I r F� tayan ■ wned wM twS PURNI ft laid= Wgo*. NoW special IMPOWOns of MM 9MO IM flat r4w;tAmdp,@r Ol F � , .n I 153 wo It Is my VON M how& This N a my 09W ww awreed" t► a Mud I w i _4M%wff The w.* hm the co FWRW ft"dftofft*,M* ed and jo 0*0 ' 10 M h + 9b 1 40 16 tit 0 ■ # *ir, 7LL # T 61 f j AL AL • �"' * k _ R41411d-role Si I- -L 16 0 Sinca", IF _�. # i s M ri 7. # +.. - !' I TRANSMITTAL LETTER PROJECT: Benson Building Addition BYU Idaho Rexburg, ID T0: Val Christiansen Building Official, 12 North: Center P.O. Box 280 FROM: WE TRANSMIT'. FOR YOUR-. City of Rexburg Rexburg, ID 83440 Brian Hauff , AIA TSE FOLLOWING,-, Z herewith PROJECT REF.: BYUBNSN DATF. July 29, 2002 If enclosures are not as noted, please, inform us immediately. If checked below, please_ N Acknowledge receipt of enclosures. Q Return enclosures to us. [:] under separate cover via: Z' in accordance with your request - 0 approval Z information F� [] drawings El specifications [] product literature � distribution to parties [� review &comment shop drawing prints � shop drawing reproducibles � other Addendum record ❑ use F-1 samples Code 13- No action required. , , %Zqfli2LUIU 4:14JU «r warning as note( Oelow under REMARKS. CQP#E5 TO: � File (with enclosures) 11 El YCtIVIHKKS: For your information. PLEASE DISTRIBUTE TO CHRIS HUSKINSON. g:lbyubnsnldocumentslcorrltransmittal Fetter -city of rexburg - val - 07-29.doc Page 1 Thanks. CTA CTA Architects ]Engineer I IS5 GroveStreet Boise, Idaho 83702 208. 336. 4900 Fax: 208. 343. 3531 h t tp d/,�i,�q�r. t p, corn -rn aRp bojseM'f0@Ctagr0Up,C0rj2 Sam Moss Jacobson Constf-uction BYU-Idaho Campus To Whom It May Concern: STATE OF I DAH P.O. Box 280 12 North Center Street Rexburg, Idaho 8344 PHONE(208) 359-3020 PAx (SOS) 359-3422 E -M -AIL cityhall@ci.rexburg.id.us 19 December 2003 The addition to the Benson Building has been completed and inspections by the Building, Fire, and Plumb irig departments have been completed satisfactorily. Only the Ele - ctrical inspectors signature is needed to issue the permanent Certificate of Occupaney. As per verbal. confirmation with the Qt3TCIerk there are a few minor items that need ta be com.pleted. This letter is to give the ager, BYU xdaha, a Temporary Certificate of Occupancy and to allow then to start moving in and occupying the building until the electrical inspection is completed and the Permanent Certificate of Occupancycan be xssued. If these are any questions regarding this letter please calf axe at X08-359-3420 exp. 3 14. Tfor your co-operation. Sincerely, Joy Berry. Building Inspector Cc to: BYU-Idaho Lloyd Benson Val Christenson Rexburg Building Official BRIGHAM YOUNG UNIVERSITY IDAHO October 3 t, 200-'-3 Cj'..tvro- 1A� � - VaI (Z"hristenseri, Building inspector P.O. Box 280 Rexbtug, ID 83440 Re: Welding Inspections at the Benson Building Dear Val; As per your request at the City luncheon on October ?,.rd P we 10% of the beam welds in the Benson Building additian hire will inspect an additional an the BY'u4daho campus. The vacation of these `vends to be identified by the City of Rexburg Buildina liepari2nen't.) Also, as findings to you. Please pari of your request, T2M ,will do the inspections and het ane knew �f you have any questions or concerns. Cc: Charles Andersen T2M Consulting Lloyd nson Project Manager 450 S. Physical plant Tygy Rexbutg, ID 83460-8205 Phone: (208) 496-2460 Fax: (208) 496-2490 `mail bensonlc@byui.edu submit their P.O. Box 143 Rexburg, Ip 83444 208-757-9172 10/21/03 Lloyd Benson Construction Manager BYU Idaho Physir.al Plant 450 S. Physical dant Way Rexburg., ID 8346Q-8205 RE; B= -A -API-*--, 9 enson Building - Skybridge Dear [Joyd, This is an amendment to our previous fetter in regards to the Benson Building Skybridge. At your request TQM Consulting has performed a end inspection on the already completed Skybridge in the new section of the Butson Building from grief dine 2.0 to 3.0 and from G_9 to the existing building. We utilized a torque wrench and filet weld gauges to da a thorough investigation of the structural items pertaining to the Skybridge. All welds, high strength bolts, s#rruetural steel, and epoxy anchor baits appear to meet plans and specifications. Approximately 10°% of the items were not aC ble, which stil meets the UBC Section 1701,5 Item 5 for, periodic inspection of fillet welds and the AISC "5,pecificatians for Structura( Jo-Ints {sin ASTM A325 or A490 Boits". it is T2M Consultingts professional opinion that all work performed is In g compliances with all applicable building roles and project documertation. Tank you far your time. We look forward to working with you in the suture. Val Christensen From: Sent: To: Cc: Subject: Brian Haff [brianh@ctagroup.com] Wednesday, July 24,2002 3:5'! PM Val Christiansen (E-mail) Rulon Nielsen (E-mail); Ryas Adelman (E-mail); Chuck Frost (E -maid); Chuck Frost (E-mail 2); Bradley, Rick; Dietrich, Tom- Hinton T Robert; Mackay, Scott; Morris, Kirk; Morrison, Jeff; Reeder, Shawn; Wilson, Scott City review comments for the Benson building Val Christiansen, We recelved your comments on The addendum I 4 2 is planned n going out project is Friday August 9. Friday and we have been'incorporating yourinformation per is planned on going t Thursday -,-noon Jul.y 25. Addendum Friday afternoon u t 2. The bid dates for the Benson I left age on your voice mail. J- rice you are busy, I thought I would e-mail a response to you to give you an updater are with responding to your comment } Item i. We acknowledgethis as an issue, but unfortunately this is out of our scope of work. Please contact r. campus architect Rulon Nielsen at 496-2449 Item We are coordinating a response to this with the Owner and when we come to a conclusi'on, we will present it to you, Items. 3: This informationincluded in the specifications you receive. the last few years, CTA has used an option of putting the Dooms Frame and Hardware Schedu.'e in the written specifications after the Finish Hardware Pleasealso look, n the Fire plans (F101 and F1 for other relevent information. Item After reviewing the existing building needs and the accessibility requirements, it was determined that (1) accessibie entry was existi'ng building at the North entry already has an accessible i. �iwillelevator , floor _Therefore, providing an accessible entry t, the addition from the fat seemed a -logical Itin which followed the required codes. Item are modifying the i t ri or ramps to comply with t the code for this item* This iniormation will be included by addend tem 6: We have reviewed these items and acknowl edgethat t Ali be done oaring coiistruction, We are currently addressing the Some iters are out of our scope Associates is putting together incorporating the revisi t The Fire Department 1 comments and incorporating ate r response. (for example , the width of the fire lane) . Keller thefratin for the fire hydrant flows. F r the fi,re alarm component r compliance.. We will send you 2) CoPies of the addenda for distribution: (1) to the Rexbur Department anci (i) for your use. If you have any questions, I plan on being in the office tomorrow bra July 4 plan on being in Rexburg cn Friday July 26 for the Pre -Bid meson with Contractors .al Thanks, Brian aff TA 1 I 8/27/200? Rulon Neilsen Ricks College Physic Rexburg.., 11D 83440 Dear Rulon, al Plans STATE OF IDAHO P.C. Box 280 12 NofthCenter Strt Rexburg, I a o 83440 Phone (208) 359-3020 Fax (208) 359-3022 WVI,fW.Gf.r2Xburg.ld,L]S e -Mail rexourg�gjcE,rexaurgjd.Us I received your letter address�ng the, Accessible Parking that I Azad asked about an my review of the Benson Drawm"g& Paragraph x.6.2 of the ADA Standards fc�r Accessible Design requires that "Accessible parking spaces serving a particular budding shall be located on the shortest accessible route of travel: to an accessible entrance_" Having 'the parking dor the Benson Addition located at the multi -Use Facility brings up an interestjP9 problein. If we ;ook at the University Parking on a campus wide" basis, does that mean that we can locate all, new parkmg ion sateffite fiats? Shouldn't the requirement for handicap spaces generated by the additional students and faculty u�z�z�ng the new aQat on -s or buildings be filled wi*Al ,Hose -;n p&rkfing spat. -.,-es. Are you suggesting that handicap spaces up at the Mult i -ase Facility should count for the requu-ed handicapped spices for new buildings and additions mound campus? Shouldn't we be changing the existing cio se -gin parking spaces to handicapped spaces as additional buildings or additions are created? It seems to nye that the- ADA standards require thai the close -in spaces be converted to handicapped spaces, even if it reduces the avera.11 amount of coo se -gin parkme. If shuttles were operated from sa.t�e�I�te parkffig lois, triose closest to the shuttle pick-up. the handicapped spares would be xequffed to be a.mvun, oil parting spaces required to be hand - capped spaces %s � Section 4.1.2 offfie ADA. Standards. Item 5 of taus section, reads "�f parking spaces are provided for s�� parkin by employees or visitars, or both, then accessible spaces complying, with 4.6 snail be provided �n each such parking area in conformance with the table below." As I slated in my rev�evv letter ;`.A�.ccord�g to the rode analysis an shut F 1 p 1 a possible additional � 91 studentscould oecupY the building, therefore an additional 1 4& parking spaces would be need to be provided. The University has plans to ��c�ease pa.-�-ki�b on ars. entire campus level. Therefore, an additional park -Mg 10. L is not required i� dose pro�ut�T icy �che bu�ia�ng. �o�vever, addItionai handicapped parking i's still required. ADA requr-ements ident"i& the need for � nddit;�,�,�� h��.�;,� paring spaces." In your leffervou state and t�zen offer, to add two if pressured.. r need -- --.. — •••.•,�...�..�viaaaa. xii.114LLVF'.,:U that youprefer ,�`�ao t io add accessibly stalls ire this area" Perhaps we have some misunderstandings between the City and the Universitv concern n2 u handicapped parking. At no time did we intend to overlook ADA Requr'ements when we agreed to view camps parkin,(,),- an an overall picture. Could the City and the University staffs �.nvalved with parking get together and discuss this matter`:' We also have some Changes ice. our Build'g Department with the addition of Biff Han-ibn as a new inspector and would like to introduce him to rest of your staff. We also would like to outline some of the new measures that � are implementing in our inspection procedures. You have been so generous in the past with hosting us at "working luncheons", we felt it was our burn to mvite you to City Hall for a working luncheon. Let us know if September loth at 11:30 A.M. would be available for tWs meetina.. Would you please provide copes of t1lis letter and invitation to all of those from. your staff that will be attending? WiU you also get back to us with a count of those who will attend? Please get back to us as soon as passible. If you have any questions, please give me a call at 3`59-3020 ext. 324. Sm'cerely, Val Christensen Building Official c.c. Mayor Bruce Sutherland Jahn Millar Stephen ZoUinger Bid Hamlin Jon Berry Chris Huskinson Kurt 14ibbert 9 August 16, 2002 Building Deparinlent City of Rexburg 12 N. Center Rexburg, Idaho 83440 Attention: Val Christensen OJ ect BRIGHAM YOUNG U NIEITY _T_. bensonAf ih tion­'oinmenf response 1. Storni Water Run-off, The University has contracted with Keller and Associates to conduct the master planning for the development of the remainder campus property to 7t'' south. The goals of the study are to maintain order in any possible future -expansion and manage run-off. The plan will manage the storm water on campus property for slow release into the City Storm Sewer + system. The new roof area for the addition will drain into existing piping and thus into the existing 5tom1 Drain System. Plans for this work will bc; submitted to: the City Offices for review. 2. Accessible Parking. The University currently provides 46 off-street accessible parking stalls, The addition of 5 new stalls into the Benson parking lot will require 7 traditional stalls be removed. ADAAG, 4.1.2 Accessible Sites and Exterior Facilities: New Construction, 4. I.2 (5)5 Table, requires that the number of stalls be calculated based on parking lot size. If the Entire Campus is considered, 20 stalls plus I per 100 are required. We have a total of 2760 parking stalls that requires 20 + 1760/100 * I — 3 8 stalls. There are 6 stalls in the TaylorlBenson Parking lot of 153 stalls where 6 are required. There are an additional 2 stalls on Center Street. From these calculations, it appears that there are adequate stalls on cainpus and in the iinmeciiai:e area. Our -preference is not to add accessible stalls in this area. If this is not an option, we would offer to install 2 additional stalls adjacent to the existing cross walk opposite the existing accessible stalls. (We are currentily preparing the Multi -Use Building parking tot for use. This lot contains '1_1 - a I U 1 3 L I L L 47 n .1 1`7 -4,11 Z) Lail x i, V L jL I I k..e I iiiAw r, a Cl U ZE Ui" L1% -'-LAO, 3. Fire lane access. I held a telephone conversation with the Fire Marshall regarding the fire lane. The lane as shown on the site plan will be a temporary lane for fire and construction access. The width is planned @ 16'. The lane will be constructed from IW" road base and gravel to support concrete trucks and fire apparatus. The site be scarified 6" below existing grade. Ru Ion Nielsen Campus A rchilect 525 & Center Rexburg ID 8340-8205 Phone.- (208) 496-2449 Fax (2 08) 496-2490 N 7/19/2002 Brian Hauff CTA Architects 1 18 5 Grove Street Boise, ID 83702 Dear Brian,, STATE OF IDAHO www-cl.rexburg.1d.us P.O. Bax 280 12 North Center Sheet Rexburg, Idaho 8344 Phone (208) 359-3020 Fax (208) 359-3022 o_mail ravil"rn(n')r�i revhr irn ir{ "c Sorry for taking so long to get back with you. Typically we have an approximate tine of tarn around on plan review of about 2 weeks from submittal. Recently that ti'me interval has increased to a little. The last few days have been extremely busy for us. Z have reviewed the plans for Ben -sen Building Addition at the BCU -Idaho campus and have identified the following discrepancies: 1. According to the code analysis on sheet F 10 1 a possible additional 5 9 1 students could occupy the bufldm'g, herefore an additional 148 parking spaces would be need to be provided. The University has plans to increase parking an an eniire campus bevel. Therefore, an additional parking dot is not required in close proxmty to the building. However, additional handicapped parking is still required. ADA requirements identify the need for 5 additional handicapped parking spaces. 2. Our policy on storm drainage requires that you submit us with a pian on how you will handle the additional storm runoff creased by the addition. This plan mush address the storm water detention so that the new flows into. the City storm sewer are metered to meed those existing prior to construction. The plan submitted does not meet our criteria. 3. Provide information an fire -rated door and window assemb�ies. I didn't see a door schedule. We will need detailed �nfarmativn on all doors in the rated 4h corridor as well as those at the area separation wail. The existing door neap the middle entrance between the two buildings will need to be gated due to its proximity to the addition. 4. Provide a handicapped ramp at the North entry. As the design is now, only stairs are existing at this entrance. 5. The handicapped ramp at the fast entry does not have 5' wide landings as required by ANSI Al 17,1-1998, Section 445.7.4. The landings must be 5' wide M each direction. 6. Z have attached a dist of discrepancies identffled by our new Mechanical Inspector as well as a report created by the Fire Department., Please return two segs of corrected plans. Lei me know if I can be of any further assistance. If you have any question, please give ane a call at 359-3020 ext. 324. sincerely Val Christensen Building Official C.C. John Millar Chris Huskinson Bill Hamlin Lloyd Bensen T ti 4 9� ■ Please return two segs of corrected plans. Lei me know if I can be of any further assistance. If you have any question, please give ane a call at 359-3020 ext. 324. sincerely Val Christensen Building Official C.C. John Millar Chris Huskinson Bill Hamlin Lloyd Bensen City Of Rexburg, Idaho Building Department Mechanical Section MR -1: (General Condftions-Sec. 14 —1&2} The +Uwner, AYh, and Contractor will recognize the, need of the City by'be apprised of all change Orders, Field Directives, etc. (without cost factors) in order that they may be reviewed to ensure that the intent of the Codes, are recognized, or provided for. MR -2: (General Conditions- Sec. 17-A 1.2&3-Inspecton of Work.) The Contractor of Project Coordinator shall notify the City of work in all instances of Systems and piping in progress and status so that the work may be viewed prior to backfill and incorporation into the project. Additionally, the City shall be advised when special inspections are scheduled and City inspectors are invited to view the inspection and receive all reports generated there from. A list of all firms engaged by the owners, A/E. or contractor shall be provided the City, along with the appr�v��l Sub -Contractor list as soon as those paries ars identified. NM -3 .(General Conditions- Section 20-G,KL,OP&R) The owner, AJE, or Contractor, shall notify the City when any need is apparent, and at the time work is begun regarding any of the Safety issues cited above , enabling the City to view the work in progress. MP -4: (General Conditions -Section 42- Contractor"s duality Control B. Asbestos) Discovery of Asbestos (Defmition expanded to include any HAZMAT as defined by CFR) shall inquire the contractor to notify the City at the same time as notification is provided the owner, and the,Proj"ect Coo dmator, or Owner shah provide, upon completion of abatement, documentation of completion of abatement and documentation of legal and proffer disposal of materials. MP -5 (Supplemental Conditions -Sec. 1.3 A,B,�C. Woxk Restrictions) Owner, Project Coordinator, and Contractor shall advise City Building Official of indent and secure temporary occupancy, based upon athen-submitted schedule and define scope of occupancy, together with a Contractor's safety pian for the public, students and staff. MR -6: (Supplemental General Conditions -Sec. 1.6-B- Industry Standards 18-,r2.) While the Building Department recognizes the mtent of this section, please modify, by addendum or Plan Revision, all the Codes and year of Code implementation this design was intended to comply with for purpose of dispute avoidance with the Building Department.(UBC 1997, !1VIC 2000, etc.) MR -7. ( Supplemental General Conditions- Selective Demo lftion-Total.) The Owm',,, Owner's Demolition an/or Abatement Contractor and Monritoi��g Lab and Disposal Contractor shah notify work start and provide the pity, at a minimum, all land -fill disposal certifications and Air Monitoring Clearances in a timely marmer in ardor that the Public trust is provided for, MR - 8: Addendum No. I was included in the City's copy of Project Manual #7. The Architect shall Provide a copy of any they are generated. later Addendums and copies of revised prinks as MR -9: (Division 15) Tie Specifications nate that the Owner may entertain stibstitutions for packaged, or Nodular HVAC Units. Additionally, the criteria dor installation and execution rely upon the "Manufacturer's Direction/Instructions", rather than direction from the A/E. In order to ensure effective Review, Inspection and Field Acceptance satisfactory to the Code and the Public Trust and archival responsibilities the A/E will provide the City Building Dept, copies of the approved submittal, prior to order�ng the equipment. This will avoid questions and concerns at the time of on-site install, MR - 10 (Supplemental. General Requirements - See 1.4 Altemates-B Schedule of Alternates.) The Architect will notify, in writing, of the acceptance of any of the Alternates (1-4) listed, to enable specific review and/or approval and incorporation under the Penmit. MR - 1 I ; (Building Perrrut Application) Approval of Permit is conditional upon the follow*n9; Subsequent to "Award of Contract", and poor to issuance of "Notice to Proceed" (or it's equivalent), The Owners, A/E, & Contractor will meet wwith the Jurisdictional Authority (City of Rexburg Building Official) at the pity Offices fora "Meeting of Understanding" (DoD Precedent) to sit procedural formats and discuss means of Cooperation whose goals are to reduce, if not eliminate, development of "Adversarial Roles" and faster " Advocacv Rnlec"f~:nntraotnr and TYTr;val;tin„n1 ,�.�,��.,r.�,p� ��.n�,I,� •� ••__••�,.�.•..v� a.��u u u111.I{.F11/L1L111,G.LA rlLi 0V1111%.+1 r71.41lLa.1LR include both management and field members. End of Mechanical review (MR) Notes REXBURG MADISON COUNTY FIRE DEPARTMENT P.O. Sox 280 26 North Center Rexburg, Idaho 83440 (2 08) 359- 3 010 1997 Unif o Fire bode Flan Review Building Name: BENSON BUILDING, BYU-I Plan Date: 6-28-D2 Review Date: 7-2-p2 Building Address: CENTER STREET, BYU. I CAMPUS Stories: 1 Type of Construction., II -1 HOUR occupancy Classification: A -3p S Existing Floor Area: FT. New Construction Floor Area: 24,805 SQUARE FEET SQUARE FEET 61,819 SQ. (TOTAL OF 861F624 1) Required Fire Flow (Appendix III -A): 1,562 GPM/TWO HOURS BASED ON THIS NEW ADDITION BEING FULLY SPRINKLERED, � amments: NONE 2) Water Supply (Article 9, Section 903) Required: YES Fire Hydrant Location: OKAY Fire Hydrant Flows.- NEW HYDRANT FLOWS UNKNOWN, NEED ESTIMATE FROM ENGINEER Fire Flow Test Location: EXISTING LOCATIONS Fire Flaw supplied By: FD other Approved Water Source.* NONE Water Supply Acceptable: YES Fire Hydrant Location Acceptable: YES Watez- Supply Comments: HYDRANT ACCESS ON EAST SIDE OF BUILDING MUST BE MAINTAINED YEAR AROUND. 3.)Fire Apparatus Access Roads (Article 9 Section 9D2? Required: SES Acceptable: Width-, No Length : YES Turning Radius: YES Grade . YES surface: YES Clearance : SES Complete Road Acceptable ; NO Turn Arounds v. YES Comments: IS THIS AN ACCESS ROAD OR A SIDEWALR? I FORESEE DIFFIUCLTY IN TURNING AN APPARATUS AROUND ON THE 14 WIDE ROAD . PLEASE FURNISH COMMENTS ON THIS SUBJECT. 4) Access loads and Water Supply, Including Fire Hydrants Are Required To Be Installed And Made Serviceable Prior To And During Time Of construction Article 9 Section 901.3) SES Comments: IF NOT INSTALLED PRIOR TO CONSTRUCTIQN AND MADE SERVICEABLE ,A STOP WORK ORDER WILL BE ISSUED, 5) Installation of Portably Fire Extinguisher 1002) Required: YES Loca�ior Acceptable: (Article 10 Section YES Type Provided Acceptable: MINIMUM SIZE SHALL SE 2A10BC Comments0 6) Automatic Fire Extinguishing Systems. (Article 10 Section 1003 Required: YES Type Of System Being Installed: WET SYSTEM Sprinkler system Monitoring Required (Article 10 Required o YES Comments o S'iJ'BMIT FLANS MARSHAL 7 ) , Standpipes Type Required 0 1. (Article 10 Section 1004) Commends.6 Section 1003.3) TO STATE FIRE Required: ND S) .Ventilating Hood And Duct Fire Extinguishing System {Article 10 Section 1006,2) Required: No Type Being Provided: Automatic Fuel Shutoff shown (.Article 10 Sect'an 1006.2.4); Portable Firms Ext' ngu.isner Shown Article 10 section 1006.2. 7 } ; Comments -, 9},Fire Alarm Systems(Article 10 Sec�on 1Q07}RequirSection0 ed. "SES Type Of System Required.* Manua Automatic: Bath; YES Type Of System Bung provided: Manual: Automatic Components Of System Shown.* Smoke Detectors: X Heat Detectors: X Manual Pull Station: X Soundinq Devices: X Visual Devices: X Door Holders a X Duct Detectors: X Flow Alarm.: Sprinkler Valve Monitoring,* Fare Alarm System Acceptable:. NO Comments: 2 SPORE WITH SCOTT OF CTA ARCHITECTS/ENGINEERS ABOUT REVISIONS OF THE ALARM COMPONENTS. HE AGREED TO THE CHANGES AND WILL DRAFT A NEW SET OF DRAWINGS. ALSO REQUIRED WILL BE POWER CONENCTION, BATTERY CALCULATIONS, CONDUCTOR TYPE AND SIZES, VOLTAGE DROP CALCULATIONS, MANUFACTURERS, MODEL NUMBERS AND LISTING INFORMATION FOR EQUIPMENT, DEVICBS AND MATERIALS, INTERFACE OF FIRE SAFETY CONTROL FUNCTIONS, ETC. 10) .Other Corrections That Are Required By Special Occupancy 0r Conditions: AS NOTED IN ABOVE NARRATIVE Plans As Submitted Are Acceptable: Plans Checked By: CHRIS HUSKINSON Date: 7- 2- 02 Please furnish comments back to the plan reviewer in the following manner: Written comments: 9 New dans.