HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00055 - Stonebrook Apartments - Nine Buildings (108 Units)CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as Completed or Shall notify
the permit holder or his agent wherein the same fails to comply with this code.
I . LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened nabs
intended dor the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly mads prior to covering or concealment,
before fixtures are yet, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
5. FRAME INSPECTION:
commonly made after the roof, all framing, firestoppring, draftstopping and
bracing are in place and after the plumbing, mechanicsl and electrical
rough inspections ars approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSP.ECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
= '� After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is com�leted and ready for occupancy.
11. OCCUPANCY PERMIT-
F-11issued when, on final inspectian, buiiding vs ready to occupy-9�
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
code and other laws enforced bv the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspection record on the job site in an accessible
and conspicuous place to allow the building official to maks the required entries. The record
shall be maintained by the permit folder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767 Building: 359-3020 ex 32G or 313
Plumbing: 359=3020 ex 3264ir 313,or 359-3034
Signature:
Date: q... I
E