Loading...
HomeMy WebLinkAboutFOUNDATION DESIGN - 02-00051 - Pioneer Farm EquipmentFOUNDATION DESIGN FOR PIONEER E IPMEN,,'T BUILDINGS REXBURGJDAHO For SteelVision Construction Foundation configuration Provided 6y Mike Bressier of S ee Vision C bT1Sti1.3 Ct l 0I1. 2, Foundation loads from Behien Mfg. Drawings 2, 3 & 4 dated 71'0 1 10% for Jab M2.239 3. Exact anchor boli locations shall be as sown an Behlen Drawings. 4. Concrete 28 day strength shall be 250Q psi mznimum_ Slump shall be 3-4.S in. Reinforcement bars shad] be ASTM AGES with Fy, = 40,000 psi. 5. Concrete construction per,ACI-318. 6. Allowable said bearing preSsure = 3000 psf 7. RectanLzular biers shown on drawings may be replaced with circular piers formed by sonotubes if the reinforcement is the same, tarea is equal to that of the rectangular pier, and there is sufficient cover for the reinforcement as required by ACX -318. INDEX Detail Pale BuildinR A Corner Column Foundation for Fi-ameiines l & 6 � Interior column Foundation for Frameiines 1 & G 3 Column Foundation for Framelines 2 Tl -u -u 5, Except 3E & 4E 4 Foundations for Columns 3E and 4F, 5 Buil Comer Column Foundation fOFFramehne A 6 Interior Column Foundation for Frameline A 7 Exterior Column Foundation for Framelines B, C & D $ Foundation for Interior Calumny on Framelines B, C D q Exterior Column Foundation for Frameline E 10 Foundation dor Interior Colunins on Frameline E I � %IREER ISTER Cz 33 Sit, Z1,,��, of G4 I $,0-W Ar "-Or SQ. PLAN VIEW S ECTI�JN TYPICAL STEMWALL REINFORCEMENT ff4 V�"RT. BARS 169 5 44 Hl7RIZ. BARS EVENLY SPACED IBJ 7' HU _ETH LINE H 4 I z4 IDE LL BOLT EXTEND SHOWN, Q.C. ASID CONTINUOUS WALL 95 BARS SACH WAY ENLARGED FOOTING PIONEER EQUjF�l'--N-'-- BUILDING A C❑RNER COLUMN FEUNDATIGN FSR FRAMELINEs 1 & 6 q P 4F L, .f e- 4'-olp El 4X_0s PLAN VIEW EXTEND 3� INTO SLABL ALL REINFORCEMENT 16 0 � C. iRS CONTINUOUS IN WALL' S T 110 w IN CORNERS L 4 45 BARS EACH WAY I ENLARGED FOU T IG PI❑NEER EQUIPMEiVT B�ILDING A INTERiOR COLUMiN FCIU!`1DATION FER FRAMEL INES i & 6 r* --t / Ip -yv.J- v r - 'F . ?lr -BES. GRADE 4 #5 VERTICAL BA INTO FOOTING TIE, TP. 10, MAX, SPAC e E I 18' WIDE CONTFNI}DU5 waLL FOOTING PLAN VIEW u _ r J-'? �, rte. , TO N SPACED A PIONEER EQUIPMEiv? BUTLD'VG A 'IOU AROUND BARS ANCHEIR - BEAM FRDH SIDE OL T 54' SLAB EACH DIRECTION H O',r/ COLUMN FOUNDATION- R �RAMELINES 2 -HRJ � EXCEPT 3E & 4E 7/15/02 1T( VERTICAL PARS., XTFt' FIOT I N. T S SHOWS! IN 12" X -BEAM tel, A N V o W 18' WADE CEINTINUDUS `: T I'L BARS, EXTEND 7[1T1 NG I, AS SHOWN I WALL F007ING �NCHOR BU.TS. SOWN) BARS FROM SIDE aNCHpR BELTS SLAB BEAM v .Ii SECTION PITNEER EQUIPMENT BUTLDING A FDUNDATIONS FORIC^uLUMNS 3E AND 4 7/17/02 p %-'rav , SPACED AS SHORN WAY w L STELMWALL REINFORCEMENT � T. BARS 16'r (J.C, AND 'O IZ, BARS CONTINUOUS SPACED I ''ALL r,om PLAN VIEW j +mac SECT I EN EXTEND SHOWN. PIONEEP, EQUIFMEN i BUILDING B CORNER COLUMN F"❑UNDATIDN FOR- FRAMELINE A 17/04 -0 V PLAN VIEW 4.9 s � L—..�,—�—�— 'L0 C` SECTION :—i 4 DIA. ANCHOR BE -L T ti �4 HAIRPIN BAR_ INTO L . E T E I) In W -L REINFORCEMENT 1, 0. C, QRS CONTINUCUS D TN WALL E M BOLTS ON CCLJMN LINE 4 BOLTS ON COLIJMN LINES 3 & 44 HAY.IRPIN BAR TIES AT 12' &C, INTO SLAB 4 44, VERT. PARS IN CURINJERS F ENLARGED BALL E DAPS EACI I WoAY rN PIONEER LQUIPMENT BUILDING B N T'-- P I LJ R COLUMN FOUNDATION FOR FRAMEL-TNE A 7/17/0 J- GRAD 4 #5 VERT INTO FOOT11 43 TI; 1 PLAN VIEW 18' WILE CONTS OU BALL � 0l1T' SECTION LdT--h 11 P CI -En A PIGNEER EQUIPMENT BUILDING B ILT BAR) I,"�LJ_ RPI ! INTO 'E AROUND I XTEND INTO SLAB ANCHOR BOLTS FAH DIC T I[3 H[I EXTERIOR CELU\IN`FOUNDATI❑N FUR FRAME' IN�S B C & D 711 15102 0 U I 101* o" S. PL\ SECTION r— r-1 I I f-11 o"N � A jr A IL I e-% i t rl-i r--% Tru " 1\ 0 SPACED DOLTS EACH WAY AS SHOWN PIONEER -7- i EQUIPME�ti' BUD DING B FOUNBATIEIN FOR INT� RIR C�1-UMNS [IN--- FRAMELINES 13, -Cl ?x 7/17/02 11 kl� %-..I PLAN VIEW 4 #5 VER T11 10, MP L T le 1 D INTO W. �PIN INTO SLAB 45 BAY'S EACH DIRE T €O SPACED AS SHOWN PI11N�ER FQ1.1TPMENT BUILDING B EXTERIOR CELUMN FOUNEATICIN FUR FRAMFI TNIF � 711712 i PLAN VIEW 4 #5 VER T11 10, MP L T le 1 D INTO W. �PIN INTO SLAB 45 BAY'S EACH DIRE T €O SPACED AS SHOWN PI11N�ER FQ1.1TPMENT BUILDING B EXTERIOR CELUMN FOUNEATICIN FUR FRAMFI TNIF � 711712 PI AN VIEW r- r1 I I r's *-"k . A OP BUILDING A ENDWALL 1 l I #'t a . -% .--. r 's Ki'L 1 '' SECTION PIONEER EQUIPMENT BUILDING B FOUNDATIJN FOR INTERT❑R CELUMNS ON FRAMELINE E 7/17/02 BARS LONG Y; BARS SHORT WAY BUILDING A ENDWALL 1 l I #'t a . -% .--. r 's Ki'L 1 '' SECTION PIONEER EQUIPMENT BUILDING B FOUNDATIJN FOR INTERT❑R CELUMNS ON FRAMELINE E 7/17/02