Loading...
HomeMy WebLinkAboutINSPECTIONS - 02-00048 - Upper Valley Resources - Remodelinspection Request:Req. BRecd BY Y_ _ 1 Project Addl-e �N Ss ,b f rJrF P 36l ln'sPection Day■ /1rn "%ftftft��t �"�sPelctol--i Report rnr5P EC ra) f I Trull SPF=� C1' ls C�ONFD L07A� S ACTzpN P E D C� ()� (P)NAL) ACTION R���I1R�,�: 1 Rec It Ack-n I'll - office 00 4c / q - 9 ka Plumb. 1 61ect. �i 1 i Py Dat,2PhOne 11631 PP 0 _'i DW(yS Lil UYSAP�'�DVEL) Cj'1,Nr07'APPL CA13LE Yellow. Job I) N. lb 0 . A� -Iry 19 mmio i..l FINAL 1j, DID NOTINgpECT '14-iiiiiiiiiiiiiiiiiiiii�1""Pector N/A J6` � ,+ , r,•. rte., g ry. �1y�� y�� � � • _.� C ! '' •4 .� _ '_ -1 "i.. _.• LL+ .7f"_•*'sly'. ®�. CITY ()F RF=)(BU1;G BUILDING INSPECTION SEQUENCE �` �'� `� 01 Type of Inspections. For on-site construction, from time to time the building official, upon not -if ication from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place., 3. FOUNDATION INSPECTION- The foundation inspection shall included excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Hough inspection: Commonly made prior to cornering or concealment, before I. fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the- rood, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: in addition to the called inspections above, the building department may maks or require any other inspections to ascertain compliance with this code and other haws enforced by the building department. INSPECTIC N CARD The permit holder or his agent shall past the inspection record on the fob site in an accessibly and conspicuous place to allow the building official tro make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOU NOTICE far to be made. Electrical: 624-3767 Building: 359-302a ex 32G or 313 Plumbing: 359,-3,020 ex 326 or 313 or 359-3034 Signature: Date: �- Y