HomeMy WebLinkAboutINSPECTIONS - 02-00048 - Upper Valley Resources - Remodelinspection Request:Req. BRecd BY
Y_ _ 1
Project
Addl-e �N
Ss
,b f
rJrF P
36l
ln'sPection
Day■
/1rn
"%ftftft��t
�"�sPelctol--i Report
rnr5P
EC ra)
f I Trull
SPF=�
C1' ls C�ONFD
L07A� S ACTzpN
P
E D
C� ()� (P)NAL)
ACTION
R���I1R�,�:
1
Rec It Ack-n
I'll - office
00
4c /
q -
9
ka
Plumb.
1
61ect.
�i
1 i
Py
Dat,2PhOne
11631
PP
0 _'i DW(yS
Lil UYSAP�'�DVEL)
Cj'1,Nr07'APPL
CA13LE
Yellow.
Job I)
N.
lb
0
. A�
-Iry
19
mmio
i..l FINAL
1j, DID NOTINgpECT
'14-iiiiiiiiiiiiiiiiiiiii�1""Pector
N/A
J6` � ,+ , r,•. rte., g ry. �1y�� y�� � �
• _.� C ! '' •4 .� _ '_ -1 "i.. _.• LL+ .7f"_•*'sly'. ®�.
CITY ()F RF=)(BU1;G
BUILDING INSPECTION SEQUENCE �` �'� `� 01
Type of Inspections. For on-site construction, from time to time the building official, upon
not -if ication from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.,
3. FOUNDATION INSPECTION-
The
foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Hough
inspection:
Commonly made prior to
cornering or concealment,
before
I.
fixtures are
set, and prior
to framing
inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the- rood, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
in addition to the called inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
code and other haws enforced by the building department.
INSPECTIC N CARD
The permit holder or his agent shall past the inspection record on the fob site in an accessibly
and conspicuous place to allow the building official tro make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOU
NOTICE far to be made.
Electrical: 624-3767 Building: 359-302a ex 32G or 313
Plumbing: 359,-3,020 ex 326 or 313 or 359-3034
Signature:
Date:
�-
Y