HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00043 - Rigby, Thatcher, Andrus Law Office - RemodelCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type Of Ior[41iO1: ro� 0�-SI10 B 11ul I rom ime io time the building off'ic'lal, upon
notification from the permit holder or his agent, shall make or cause to be made
in�Rg��io�� ��d mall �iCh�r approu� A� poion of the construction as completed or shall noti Y
the Permit holder or nes agent w�rein the same fails stakld
'st, , king in s tl
o eaclompIbVuil
wphis c ode.
LAYOUT: �:.
r Lof corn
er
2. FOOTING:_ Commonly made afterapoles oppiersare sedtiogtrenohesexcavat
ion
or Forb asement
" V
are -as aexcavated. ,ms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation insPec 116n shall included excavations for thickened slabs
..intended for the support of bearing walls, partitions, structural supports, or
equipment a
nd special requirements for wood foundations. All forms and
4. PLUMBINGreinforcing
c., shall be in
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection..
5. TRUSS INSPECTION:
Inspections of 'trusses{f
6. FRAME INSPECTION:
Commonly made after the roof, all framing, fi restopping, draftstopping' and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Burea
7• LATH AND/OR WALLBOARD INSPECTION:u)i
Commonly made after ail lathing and/or wallbd i oarnterior s in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION-
Commonly
made after the building iS completed and ready for Occupancy.
11. OCCUPANCY PERMIT:
Iwhen, on final inspection, building is ready to occupy.
f2. OTHER INSPECTIONS:
In addition to the called inspections above, the building department ma
" make or require any other inspeict
y
ions to ascertain com iiar�ce -
' 'code and other laws enforced bv theP with this department..
The permit holder or hf INSPECTION CARS
s agent shalt past the inspection record on the job si#e in an accessible
Cuaus
end consp"pl�Ce to allow the bu?flding official to rr�2ke the required en#ries. The shall be maintained by the permit holder until the f�nal inspection has been made and a�cQo�ve
I have read the above and Wa1I eorr�p�y �n my requests for inspections by �pd�
NOTICE prior for inspections to be made. 24
Eieetrical: 624-3757
Plumbing: 359-3020 ex 326 or 313 or 359-3D34
Signature
EWA
Building.: 359-3020 ex 326 or 313
Date: � Tu/
i. `�'S NAL -4 ~j
� �� ."'
v 6 _ i 21 �
���Li'� � � �'+��
- •, Y ..� � Ti-s��p.� '�f'_ �•
�
�,
� e �,� " —
�
_
i97T .yam 'a �. �
� r 4�j� 4 ��� �• •,C' _
� •X - � }r��• �F _P'' Ylg�
.� .}k �
t, �, �'."� �Yr• ' �f�.+ y - — - - 'c _
-
'� r' �
p'�;. �. ,4
., eJ} p' y��, y �, .
.
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type Of Ior[41iO1: ro� 0�-SI10 B 11ul I rom ime io time the building off'ic'lal, upon
notification from the permit holder or his agent, shall make or cause to be made
in�Rg��io�� ��d mall �iCh�r approu� A� poion of the construction as completed or shall noti Y
the Permit holder or nes agent w�rein the same fails stakld
'st, , king in s tl
o eaclompIbVuil
wphis c ode.
LAYOUT: �:.
r Lof corn
er
2. FOOTING:_ Commonly made afterapoles oppiersare sedtiogtrenohesexcavat
ion
or Forb asement
" V
are -as aexcavated. ,ms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation insPec 116n shall included excavations for thickened slabs
..intended for the support of bearing walls, partitions, structural supports, or
equipment a
nd special requirements for wood foundations. All forms and
4. PLUMBINGreinforcing
c., shall be in
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection..
5. TRUSS INSPECTION:
Inspections of 'trusses{f
6. FRAME INSPECTION:
Commonly made after the roof, all framing, fi restopping, draftstopping' and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Burea
7• LATH AND/OR WALLBOARD INSPECTION:u)i
Commonly made after ail lathing and/or wallbd i oarnterior s in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION-
Commonly
made after the building iS completed and ready for Occupancy.
11. OCCUPANCY PERMIT:
Iwhen, on final inspection, building is ready to occupy.
f2. OTHER INSPECTIONS:
In addition to the called inspections above, the building department ma
" make or require any other inspeict
y
ions to ascertain com iiar�ce -
' 'code and other laws enforced bv theP with this department..
The permit holder or hf INSPECTION CARS
s agent shalt past the inspection record on the job si#e in an accessible
Cuaus
end consp"pl�Ce to allow the bu?flding official to rr�2ke the required en#ries. The shall be maintained by the permit holder until the f�nal inspection has been made and a�cQo�ve
I have read the above and Wa1I eorr�p�y �n my requests for inspections by �pd�
NOTICE prior for inspections to be made. 24
Eieetrical: 624-3757
Plumbing: 359-3020 ex 326 or 313 or 359-3D34
Signature
EWA
Building.: 359-3020 ex 326 or 313
Date: � Tu/