Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00042 - Main Street Station ApartmentsCITY OF REXBURG Type of Inspections: For on-site construction, from time to time the building official, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the Permit holder or his agent wherein the same fails t0 Comply with this QQdQ, 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slakes intended for the support of bearl'Ing wars, partitions, structural supports, or equipment and special requirements for woad foundations. All dorms and reinforcing steel, etc., shad bein place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: inspections of trusses. 6. FRAME INSPECTION: Commonly made atter the roof, all frarn'ing,, firestopping, draf�stopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical bureau) 7. LATH AND/OR WALLBOARD INSPECTION: �,� Commonly made after all lathing and/or wallboard interioris 66' place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING ASVD HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly mads after the building is completed and ready for occupancy . 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy, 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may maks or require any ether inspections to ascertain compliance with this code and other haws enforced bv the building department. INSPECTION CARD The permit holder or his agent shad post the inspection record on the job site in an accessible and conspicuous place to allow the building official to make the required entries. The record shill be maintained by the permit holder until the final inspection has been made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767Building- 359-3020 ex 32G or 313 Plumbing: 359-3,020 ex 326 or 313 or 359-3034 Signature:� Date s