HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00041 - Airport Lot #30 - Airplane HangarCITY OF REXISURG
BUILDING INSPECTION SEQUENCE
Type of l�sPections: For on-site cons#ruc#ion, from time to time the building offidai, upon
notification from the permit holder or his anentshall mak� or cadi-qR tn ha mnriA an nprAcenr.►
inspections and shall either appy
-q
ane permit holder or his agent wherein the s
1 a
) 1k
3.
LAYOUT:
ame fails to comply with this code.
Lot corners staked, staking in place for build inq� prior to P,,xr,;3vqfinnl
00mmonly Ma
je after poles or piers are set or trlenches or basement
areas are excavated. Forms and horizontal reinforcing fiedin place,
vertical reinforcing cut and on job site or tied in place.
FOUNDATION INSPECTION:
The foundation inspectian shall included excavations dor thickened slaws
intended dor the support of bearmng wails, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL-
0
Rough inspection: Comm�niy made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRANCE INSPECTION:
Commonly made afhe roof, all raming, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are appraUe�. (Electricai inspection performed through
State of Idaho Electrical Bureau}
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all bathing and/or wallboard interior is in place, but
before any plaster s applied, or before wallboard joints and fasteners are
taped and finished -1
8. FINAL PLUMBING AND HEATING INSPECTION:
AIS systems in place, fixtures sit, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. SINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections bove, the building department may
make or require any other inspections to ascertain compliance with this
cods and other laws .enforced by the building department.
INSPECTION CARD
The permit balder or his agent shad! posh the inspection record on the jo� site in an accessible
and conspicuous place to allow the building official to mike the required entries_ the record
shad be maintained by the permit holder until the final inspectio s been mads and appraved.
I have read the abase and will com�iy in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: G24-3757 - -
Plumbing: 3549-3020 ex 326 or 313
Signatu�
eswiaing: 35 9-3020 ex 326 or 313
re.
6W, 43n
to Date..
0
J
ove that
portion
of
the
construction as
r:mmniPtpri nr
chats nntif„
ane permit holder or his agent wherein the s
1 a
) 1k
3.
LAYOUT:
ame fails to comply with this code.
Lot corners staked, staking in place for build inq� prior to P,,xr,;3vqfinnl
00mmonly Ma
je after poles or piers are set or trlenches or basement
areas are excavated. Forms and horizontal reinforcing fiedin place,
vertical reinforcing cut and on job site or tied in place.
FOUNDATION INSPECTION:
The foundation inspectian shall included excavations dor thickened slaws
intended dor the support of bearmng wails, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL-
0
Rough inspection: Comm�niy made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRANCE INSPECTION:
Commonly made afhe roof, all raming, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are appraUe�. (Electricai inspection performed through
State of Idaho Electrical Bureau}
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all bathing and/or wallboard interior is in place, but
before any plaster s applied, or before wallboard joints and fasteners are
taped and finished -1
8. FINAL PLUMBING AND HEATING INSPECTION:
AIS systems in place, fixtures sit, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. SINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections bove, the building department may
make or require any other inspections to ascertain compliance with this
cods and other laws .enforced by the building department.
INSPECTION CARD
The permit balder or his agent shad! posh the inspection record on the jo� site in an accessible
and conspicuous place to allow the building official to mike the required entries_ the record
shad be maintained by the permit holder until the final inspectio s been mads and appraved.
I have read the abase and will com�iy in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: G24-3757 - -
Plumbing: 3549-3020 ex 326 or 313
Signatu�
eswiaing: 35 9-3020 ex 326 or 313
re.
6W, 43n
to Date..
0