BUILDING INSPECTION SEQUENCE
` Type of Inspections: For on-site construction, from time to time the buildin
9 official u on
r� otlfication fromthe permit holder or his ag�n#, shall make �r cause #o be ade any necessary
inspections and shall either approve that portion of the construction as completed or shall natif
Y
the permit holder or his agent wherein the same fails to comply with this code.
1 . LAYOUT: Lot corners staked, staking in piaci for bui�din rior to excavation:
9P
210 FOOTING: Commonly made after pokes or piers are yet or trenches or basement
r= areas are excavated. Firms and horizontal reinforcing tied in place,
vertical reinforcing gut and on jab site or died in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations dor th,"ckened slabs
intended for the support of bearing wads, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the raof, all framing, firestoppin
g, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
?. LATH AND/OR WALLBOARD INSPECTION,Fr
M � Commonly made after all lathing and/or wallboard interior is in place, but
before any piaster is applied, or before wallboard joints and fasteners ars
:. taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALKINSPECTIONS:
After forms ars set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12, OTHER INSPECTIONS:
if duuman ro ane cajied inspections abase, the building department may
maks or require any other inspections to ascertain compliance with this
code and ager laws enforced bxl the building department.
INSPECTION CARD
The hermit holder or his agent sha!! post tie inspection record an the job site in an accessible
and conspicuous place to allow the building official to make the required entries. he record
shall be maintained by the permit holder until the final inspection has been made and apprQVed.
I have read the above and w61l comply in rrty requests dor inspections by giving 24 HOUR
NOTICE prior for inspections to be made.