HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00039 - Nauvoo Apartments - New Managers Building■ W
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or Shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1, LAYOUT; Lot coinci3 51raKed, sia�ir�g in place for building, pflof to excavation;
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing fiedin place,
vertical reinforcing cut and on job site or tied in place.
3.
5 1
FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened subs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shall be in place.
CAL AND ELECTRiCAL:
Rough
inspection:
Commonly made prior to
covering or congealment,
before
fixtures are
sit, and prior to framing
inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftstopping and
kir-acing are in place and after the plumbingr, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
cede and other laws enforced by the building department..
INSPECTION CARD
The permit holder or his agent shall post the inspection record an the job site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shall be maintained by the permit holder until the final inspection has been made and approved.
have read the above and will comply an my requests forinspections by gluing 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-37G7 ,5 Building: 359-3020 ex 325 or 313
Plumbing: 359-3Q20 ex 32Q" or 3► or 359-3034
Signature: '�1 _ Date:
i