Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00037 - Parkview Apartments - 4-PlexCITY OF REXBUny BUILDINifigrion 6EQUENCE ype of Inspections. For on-site constrVQIIQn, trom 1118 t0 time,the bulldlflq OfflClal, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails tO comply with this code. 1. LAYOUT.- got corners Stakea, sr�king in place for building, prior to excavation: 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in plaQQ, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall incl�ded excavations for thickened slabs intended for the support of bearing malls, partitions, struetural support, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AFD ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. INSPECTION.. TRUSS Inspections of trusses. f. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in- place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard points and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. SINAL INSPECTION: Commonly 11. OCCUPANCY PERMIT: Issued whe 12. OTHER INSPECTIONS: made after the building is completed and ready for occupancy. n, on final inspection, building is ready to occupy, In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code end other laws enforced b th � buildingdepartment_ The permit holder or his igen# shall INSPECTION CARD posh the inspection record on the fob site in an accessible and conspicuous place to allow the bLjilding official to mike the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved, I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Building: 359-30�0 ex;j26 or 313 PEumbir�g: 359-3020 p x 326 013 or 359-3034 Signature*", Date: �.-