Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00036 - 115 S 2nd W - New Storage Units^f d I r 1 BUILDING INSPECTION SEQUENCE Type Of jh�p(�Ctjons: For on-site construction, from time to time the building official, upon notification from the permit holder or hes agent, Shall make Or Cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1. LAYC)VT,- 51ahod, �taing in place for bUiolnQ5 prior to RICAVAtiono 2. FOOTING: Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on lob site or tied in place. 3. FOUNDATION INSPECTION: 7 The foundation inspection shall included excavations for thickened slabs intended for the support of bearing walks, partitions, structural supports, or equipment and special requirements for wood foundations. All farms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: 5. 61 ri a 10. Rough inspection: Commonly mads prior to covering or ion before fixtures are set, and prior to framing inspection. TRUSS INSPECTION: I nspectio FRAME INSPECTION: ns of trusses. CealfC'lent, Commonly made after the roof, all framing, firestopping, draftstopping and bracing ars in place and after the PJUL mbing, mechanical and electrical rough inspections ars approved, {Electrical inspection performed through State of Idaho Electrical Bureau} LASH AND/OR WALLBOARD INSPECTION: CommOnly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are gaped and finished. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. SINAL INSPECTION, Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this cods and other laws enforced by the building department. INSPECTION CARD The permit holder or his agent shall post the inspectifln retard on the fob side in an accessible and conspicuous place to allow the building official to make the required entries. The record steall be maintained by the permit holder until the final inspection has been made and approved. 1 have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prier for inspections to. be mads. Electrical; 624-3767 - �'`�J Building: 359-302Q ex 326 or 313 Plurnbing: 359-3,020 ex 326 or 313 or 359-3034 Signature: r Da e: