HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00036 - 115 S 2nd W - New Storage Units^f d
I r
1
BUILDING INSPECTION SEQUENCE
Type Of
jh�p(�Ctjons: For on-site construction, from time to time the building official, upon
notification from the permit holder or hes agent, Shall make Or Cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1. LAYC)VT,-
51ahod, �taing in place for bUiolnQ5 prior to RICAVAtiono
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on lob site or tied in place.
3. FOUNDATION INSPECTION:
7
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walks, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
5.
61
ri
a
10.
Rough
inspection:
Commonly mads prior to
covering or ion
before
fixtures are
set, and prior to framing
inspection.
TRUSS INSPECTION:
I nspectio
FRAME INSPECTION:
ns of trusses.
CealfC'lent,
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing ars in place and after the PJUL mbing, mechanical and electrical
rough inspections ars approved, {Electrical inspection performed through
State of Idaho Electrical Bureau}
LASH AND/OR WALLBOARD INSPECTION:
CommOnly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
gaped and finished.
FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
SINAL INSPECTION,
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
cods and other laws enforced by the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspectifln retard on the fob side in an accessible
and conspicuous place to allow the building official to make the required entries. The record
steall be maintained by the permit holder until the final inspection has been made and approved.
1 have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prier for inspections to. be mads.
Electrical; 624-3767 - �'`�J Building: 359-302Q ex 326 or 313
Plurnbing: 359-3,020 ex 326 or 313 or 359-3034
Signature:
r Da e: