Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00035 - Legacy Cove Apartments - Bldg #3;. 111 ATIf BUILDING INSPECTIONSE�II��lCE Type of Inspections: Fir on-s��e cans#ructian, notification from the permit holder or his � end from time #o tune the building official, upon inspections and shall either approve that portion of the construct" make or C��S� to be made any necessary the permit holder or hidagent ion as campleted or shall nQJify the sa�1� ����� �b �4mp�y with th�� cede. � . LAYOUT: Lot corners staked, stakinginplace f2. F�C�TING. Corr�monly made after afes opiersor but�d�ng, prior #o ex�ava�ion:� are set or trenches or basement areas are excauated. Forms and horizontal reinfQrcing tied in place, vertical reinforcing cud and �n �a� sit 3. FOUNDATIONtied in placebINSPECTION.- The foundation fnspection shall included excavations dor thickened slabs intended for the support of be aring walls, partitions, structural supports, or equipment and speciai requirements for woDd foundations. ASI dorms and reinforcing steel, etc., Shall be in place. 4. PLUMBINGMECHA{UiCAL AND ELECTRICAL: Rough inspection.a Commonly made prior to covering or concealment before fixtures are sed, and prior to framing inspectd- 5.:or�. TRUSS iNSPECTlON 6. FRAME INSPECTION:Inspections o� trusses. Commonly made after the- roof, all framing, firestopp* ing, draffistoppingandbraying are in place and of#er #he p#umbing, mechanical and elecelectrical rough inspections ars approved. (Electrical inspectian performed through State of Idaho Electr'cai Bureau) 7. LATH ANDI�]R WALLBOARD INSPECTION.0 Commbnly mads after all lathing and/or wallboard interior is inplace, bu# before any plaster is applied, or before �rallboard foints and fasteners gaped and finished. are $- FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms ars yet, prior to placing concrete. 10. FINAL INSPECTION: Commonly mads after the building iS corefeted and ready for occupancy. 1 � . OCCUPANCY PERMIT: Issued when, an final inspectionbuiding is ready to Occup . 12. UTHER lh�SPECTIpNS:Y In addition to the called' inspections above, the building department rna make or require any other inspections to ascertain compliance with this code and other laws enforced bv�4RD the building department. The permit holder ar his agent sha�f INSPECTION Cpost the inspection record an the 'off i . and conspictiaus place to allow the building ofticial to make the re eCed � s �e �n an accessible shall he maintained by the permit holder until the Binal inspection as been �n tries. e record have read the above and will complyin my requests for inspections by 24d approved. �!C3TICE privy for inspections to b� made. HOUR Electrical: 624-3767 � -- -- Plumbing,- 359-302Q ex 326 or 313 or, 359-3x34 Signature: 359-3020 ex 326 or 313 Date,,. 7---- 9/., I� e