BUILDING INSPECTION SEQUENCE
Typf I I I f 11- 1 S
e of In PeolionlIffi* For 0ANS11@ con.Kt[uetlony from lime to fiM6 1N6 �U11d�n
I a
0111cial upon..
4
'
fluuncauon ram me permit ,no aer or Mis agent, shall make or cause to be made any necess Fy
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
t . LAYOUTS Lot corners staked, staking in place for building, pr'i'or to excavation:
2. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
R,
intended for the suppori of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundationsb -All forms and
reinforcing steel, etc., shat! be in P lace.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
5.
6.
741
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and Dt'ior to framinn in_cznPr_tinn
TRUSS INSPECTION: 1b
Inspections of trusses.
FRAME INSPECTION:
Commonly made after the roof, a!1 framing, firestopping, draftstopping and
bracing are-i� dace �`ia� a##er the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performedthrough
Stateof Idaho Electrical Bureau)
LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any piaster is applied, or before wallboard joints and fasteners are
typed and finished. 4.411
FINAL PLUMBING AND HEATING INSPECTION:
All sys�er�� in place, fi�xtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:.k, V'
After forms are sit, Drior t0 [:inn �rnnrrPtp
1D,
FINAL INSPECTION: � "�`' ' V� �Y�V�v� �
Comr
11. OCCUPANCY PER
nanlyad :after th`e 15'
udding R_ ( F1%1-- LawIs M1 completed and ready for occupancy .
Issued when�" fina0in. specti , buillding isrready to occupy.
12. ETHER INSPECTIONS: =
In all
d� t to'" the � fed in$,p� ions ak v th6building ��� department rnayb� 11
rraak� r require an 'other inspections to ascertain compliance with this
cafe and other laws enforced by the building department.
INSPECTION CARD
The permit hoiden or his agent half post the inspection record o� the jib site in an accessible
and conspicuous piaci io allow the building official to mike the required en t i The record
shall be maintained by the permit holder until the final inspection has been made and approved,
I have read the above and will comply in my requests for inspections by gilding 24 HOUR
NOTICE prior for inspections to be mader&,�
Electrical: 624-3767<'31:2
,.guifding: 359-3[320 ex 326 or X13
Plumbing: 359-3 20 ex 32 � or 359-3034
Signature:------- Date:
r
CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For an -sits construc#ion, from #ime to time the bu Ildi�,g official, upon
notification from the permit holder or his agent, shall make of cause to be made any necessary
in-5pCGtion3 and 5nall eitner approve that ponion of tho M #r. ction as competed or shaft notify
the permit balder or his agent wherein the same fails to comply with this cede.
1 . LAYOUT: Loi corners slaked, staking in place for builoingi prior to excavation:2. FOOTING: Commonly made after piles or piers ars set or trenches or basement
areas ars excavated. dorms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or filed in place.
3. FOUNDATION INSPECTION:
The foundation inspection shah included excavations for thickened stabs
intended for the support of bearing waif, partitions, structural supports, or
equipment and special requirements for woad foundations. All dorms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL SND ELECTRICAL;
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are sed, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses.
5. FRAME INSPECTION:
7.
Commonly made after the rood, all framing, firestopping, draftstOlDpingpandbraying are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
LAI H AND/UR WALLBOARD INSPECTION
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or -before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the. building is completed and ready for occupancy.
it. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced bv the building department.
INSPECTION GIRD
the permit holder or his agent shall post the inspection record on the job site fn an accessible
and conspicuous prate to aliow the building official to mike thequired entries_ The record
shalt be maintained by the permit holder until the final inspection has been made and approved.
1 have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767 Building: 359-3020 ex 326 or 313
Plumbing: 359-3420 ex 326 or 313 or 359-3034
Signature: Date.-