Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00032 - 355 W 2nd S - Triplex Remodels V sk 4 a " - - - L CITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time notification from the permit holder or his agent, shatl make o� cause the building official, upon inspectFons andshall either a�p�vve that portion �� the construction to be made any necessary the permit holder or his agent wherein the same fails to com an �s corr3pleted or shall notify I . LAYOUT. Lot corners staked, Makin rnplace fap�� �,th this cv�de. 2. FUOTING: Commonly made afterpoles �piers are prior to excavation: a e set or trenches or basement areas are excavated. Forms and horizontal rein -forcing died in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shah included excavations for thickened slabs intended for the support of bearing walls, partitions, structural suppor#s, or equipment and special requirements for wood foundations. AIS fauns and reinforcing steel, etc., shaft be ars place. �_ PLUMBING, N1ECH,,�IVICgL AND ELECTRICAL, 5. 7. Haugh inspection: commonly made prior to covering or concealment, before fixtures are set, and prior toy framing �nspection. TRUSS INSPECTION: Inspections of trusses. FRAME INSPECTION Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are aPProved. (Elecirical inspect'ion performed through State of Idaho Electrical Bureau) LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fastener taped and finished. � s ars FINAL PLUMBING AND HEATING INSPECTION: 9. ASI systems in place, fixtures sed, ready far occupancy S�IDEVIIALK INSPECTIONS: After farms are yet, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy . 11- OCCUPANCY PERMIT- Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the cabled inspections abase, r� the building department ma maks or require any other inspections to ascertaicompliance with #his code and other haws enforced by the building department, The permit holder or his agent shaCARD �INSPECTION hspec#ion record on the job site in ars accessible and conspicuous place to allow the building official to mike the required entries. The rec shall be maintained by tree permit holder, ur��if the final inspection has been made and apQ�adve I have read the above and will comply in my requests for inspections bey givin 24 HOUR� NOTICE prior forinspections to be made, � Electrical: 624-3767 Building: 359-3020 ex 326 Plumbing.- 359-3D 0 ex 326,or 3�J� �r 35 ��-303L .0- _/J & 4 or 313 Signature: r