HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00031 - Greenbrier Apartments - RemodelCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of inspections: For on-site cons4ruction, from time to time the building official, upon
-notification from the permit holder or his agent, shall make or cause to be made ar�y necessary
inspections and shall either approve that portion of the construction as Completed or shali notif
the permit holder or his agent wherein the same fails tO comply with this code. y
� .
LAYOUT: Lot corners staked, staking in place for buildinaprior to excavation:
r.
2. FOOTING: Commonly made after poles or piers are yet or trenches or basement
3.
4.
0.
*1
7.
8.
9.
10.
al t=cJ dt u excavatect. corms and horizontal reinforcing tied 'in place,
vertical reinforcing cut and on jai site or tied in place.
FOUNDATION INSPECTION:
the foundation inspection shall included excavations dor thickened slabs
intended for the support of Gearing walls, partitions, structural supports, or
equipment and special requirements for mood foundations. All farms and
reinforcing steel, etc,, shah be in place.
PLUMBING, MECHANICAL ANS ELECTRICAL:
Rough inspection; Commonly mads prier to covering or cvnc
before fixtures are set, and prior to framing inspection,
TRUSS INSPECTION:
Inspections of trusses.
FRAME INSPECTION:
ealment,
Commonly made after the- roof, all framinn firpqtn in ri r ff + .0 .•.
bracing ars in place and after the plumbing, mechanical and and electrical
�� ��
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
LATH AND/QR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wailbocq..rd joints and fasteners are
taped and finished.
FINAL PLUMBING AND HEATING INSPECTION-
0
All systems in place, fixtures yet, ready dor occupancy
SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
FINAL INSPECTION:
11.
Commonly made after the building is completed and ready for occupancy .
OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONSIN.
in addition to the called inspections above, the buildincl dePar#ment may
maks or require any other 'inspections to ascertain cwith this
code and ether laws enforced by the building department_
INSPECTION BARD
The permit holder or his agent shall pest the 6nsp�c#ion record on the job side in an accessible
and conspicuous. pace to allow the building official to mike the required envies. The record
steall be maintained by the permit holder until the final inspection has been made and a roue _
I have read the above and will comply in my requests for inspections by Rp dNOTICE prior for inspectionssto be made. giving �4 HOUR
Electrical: 624-3767 ,� � Building: 359-3020 ex 326 or 313
Plurnbing: 35z)-3020 x 326"or 313 or 359-3€}34
Signature: Date; � �•
11