HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/14/2021
File Name:
21020DFR07142021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/14/2021
A596791B-E374-40CB-A5EE-F7C0BAB97DEC 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
12:30 PM
Client:
Madison School District
Contractor:
ML Masonry
End Time:
03:00 PM
Inspection Type(s):
Masonry Reinforcement
Masonry Grout Placement
Location(s):
Gymnasium partition walls
Observations/ Remarks:
I arrived on site around 12:30 PM and inspected masonry reinforcement. The masonry reinforcement
was observed to meet specification for size, grade, spacing, lap length, and placement. Masonry grout
arrived on site around 1:30 PM and masonry grout was placed according to specification with
vibrations at every vertical rebar. Eric from ML Masonry was informed of masonry reinforcement
inspection observations as well as masonry grout placement observations. Left side around 2:45 PM.
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/14/2021
File Name:
21020DFR07142021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/14/2021
A596791B-E374-40CB-A5EE-F7C0BAB97DEC 2
Inspection Date:
07/14/2021
File Name:
21020DFR07142021LC
Inspector's Signature:Inspector's Name:
L. Clifford
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/14/2021