Loading...
HomeMy WebLinkAboutSPECIAL INSPECTION 2 - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/14/2021 File Name: 21020DFR07142021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/14/2021 A596791B-E374-40CB-A5EE-F7C0BAB97DEC 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 12:30 PM Client: Madison School District Contractor: ML Masonry End Time: 03:00 PM Inspection Type(s): Masonry Reinforcement Masonry Grout Placement Location(s): Gymnasium partition walls Observations/ Remarks: I arrived on site around 12:30 PM and inspected masonry reinforcement. The masonry reinforcement was observed to meet specification for size, grade, spacing, lap length, and placement. Masonry grout arrived on site around 1:30 PM and masonry grout was placed according to specification with vibrations at every vertical rebar. Eric from ML Masonry was informed of masonry reinforcement inspection observations as well as masonry grout placement observations. Left side around 2:45 PM. Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/14/2021 File Name: 21020DFR07142021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/14/2021 A596791B-E374-40CB-A5EE-F7C0BAB97DEC 2 Inspection Date: 07/14/2021 File Name: 21020DFR07142021LC Inspector's Signature:Inspector's Name: L. Clifford Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/14/2021 A596791B-E374-40CB-A5EE-F7C0BAB97DEC 3