Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00024 - Westmark Credit UnionCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections.- For on-site construction, from time to time the building official, upon notification from the permit holder or his agent, shad made or cause to be made any necessary inspections and shall ether approve that portion of the construction as completed or shall notify the hermit holder or his agent wherein the same fails to comply with this code. 1 . LAYOUT: Loi corners staked, staking in place, dor building, prior to excavation: 1, z, FOOTING: Commonly made after pops or p ' ers are sed or 1'rench-es or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcirFg cut and on job site or tied in place. 3. FOUNDATION INSPEGTION: The foundation inspection shall included excavations for thickened nabs intended for the support of bearing wars, partitions, structural supports, or equipment and special requirements for wood foundations. All farms and reinforcing steel, etc., sha!l be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly mads prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses,, fi. FRAME INSPECTION, Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7, LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior 'Is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After corms are set, prior to placing concreie. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, buildingis ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may maks or require any other inspections to ascertain compliance with this code and ether haws enforced bvi the building department. INSPECTION CARD The permit holder or his agent shall pest theinspection record on the fob site in an accessible and conspicuous place to allow the building official to make the required entries. The record shah be maintained by the permit holder until the final inspection has been made and approved. I have read the above and will comply in my requests for inspections by giving, 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Plumbing: 35�-3020 ex- 3�-. or 313 or 359-3Q34 Signature: Building: 359-3020 ex 326 or 313 [date i �"