HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00024 - Westmark Credit UnionCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections.- For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shad made or cause to be made any necessary
inspections and shall ether approve that portion of the construction as completed or shall notify
the hermit holder or his agent wherein the same fails to comply with this code.
1 . LAYOUT: Loi corners staked, staking in place, dor building, prior to excavation:
1,
z, FOOTING: Commonly made after pops or p ' ers are sed or 1'rench-es or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcirFg cut and on job site or tied in place.
3. FOUNDATION INSPEGTION:
The foundation inspection shall included excavations for thickened nabs
intended for the support of bearing wars, partitions, structural supports, or
equipment and special requirements for wood foundations. All farms and
reinforcing steel, etc., sha!l be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly mads prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION:
Inspections of trusses,,
fi. FRAME INSPECTION,
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7, LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior 'Is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After corms are set, prior to placing concreie.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, buildingis ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
code and ether haws enforced bvi the building department.
INSPECTION CARD
The permit holder or his agent shall pest theinspection record on the fob site in an accessible
and conspicuous place to allow the building official to make the required entries. The record
shah be maintained by the permit holder until the final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving, 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767
Plumbing: 35�-3020 ex- 3�-. or 313 or 359-3Q34
Signature:
Building: 359-3020 ex 326 or 313
[date
i �"