Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00022 - BYUI Austin Bldg - Addition (PHASE 1)T 4�„ - A , rh Y ;s �Yp f� A i � 1 , •1 .. a 1, I x T 4�„ rh Y F D 7 40 F._: 9r y s.,"T 1 M W -J CITr OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For o0 F ri-slt� M61'f'Ca1'o,n Irom Q411+�fiuGtI�Jn, fro�1 1l�#o ta tll�6 iI�e k�u�ld�r, the permit h�oider ar his agent, shall make or cause to g aff,c,af, uponIC1Sp2CtiDns and shall eF#her apprtive that porton of the cor�structian made any necIessary the permit holder or his agent wherein the same fails to comply with this �m��eted or shad notify 1 . LAYOUT: Lot corners staked, shaking inplace ford building, �o��.2. FOOTING: Commondy made after pals or piers ars s �r�ar to excavation or basement areas are excavated. Forms and horizontal reinforcing tied in place, ver#ical reinforcing cut and on fob site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended for the support of bearing wales, partitions, structural supports, or equipment and special requirements for wood foundations. All forms and MECHANICAL reinforcing steel, etc., shah be in place. �. PLUMBING, AND ELECTRICAL: Rough inspection: Commonly m,�de prior to covering or concealment,before fixtures are se#, and prforto framing inspection. 5• TRUSS INSPECTION: Inspections of trusses. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracin9 are in place and afier the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Flectrical bureau) 7. LATH AVD/QR WALLBOARD INSPECTION- Commbnly : made after all lathing and/or wallboard interior is in place, but before any piaster is applied, or before wallboard points and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: ASI systems in placix ures, set, ready for occupancy 9. SIDEWALK INSPECTIONS: After foams are set, prior to placing concrete. 10. FINAL INSPECTION: 11. Commonly made after the building is completed and ready for occupancy . C)C��JPANaCY PERMIT: Issued when, on final inspection, building is ready to occupy. 1214. OTHER, INSPECTIONS: '`'p of addition to the called inspections above, the buildingde artment maks �r require any Other 'inspections #o ascertain copliance withthisy code and other laws enforced bv the buildir�g departmenCARD� Theperrnit holder or his a ent shall INSPECTION 9 post the inspection record on the jab site in an accessible 1 and conspicuous place to allow the building official to mike the required entries. The record shall be maintained by the permi# holder un#il the inal inspection has been made and approved. have read the above and will comply in my requests for inspections by diving 24 HOURNOTICE pilar for inspections to be made. Electrical.- 624-3767 - -., -• � -- - 020 PIU��bing: 359-302�3 ex 326 or 313 or 359-3034 Signature: aunaing: �5y-3ex 326 or 313 ..... aim Date.,