Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00020 - Dr Max Crouch Office - RemodelS, CITY OF REXBURG Type of inspections: For on-site construction, from time to time the building official, upon nntifiratinn irnm +ho .,.....,a� ti,.ia,._ _� �:_ _. ,. • ....+...e�r r +i vs i r i is P171 I f I LAU rfis agent, snait maKe or cause to be made any necessary ir�spectEons and shall either approve that portion of the construction as completed or shall notifythe permit holder or his agent wherein the same fails to comply with this codeBUILDING INSPECTION SEQUENCE I I W . ter, T Zvi turners staKea, staKmg in place tor owiding, prior to excavation: 2. FOOTING: Commonly made after poles or piers are set or trenches or basement arias are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cud and on job site or tied in place. 3. FOUNDATION iNSPECTION: The foundation inspection shah included excavations for thickened slabs intended dor the support of bearing wads, partitions, structural supports, or equipment and special requirements for wood foundations. All forms and reinforcing steel, etc., shall be in face. 4. PLUMBING,, MECHANICAL AND ELECTRICALI Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to fram�ng jonspection. 5. TRUSS INSPECTION: Inspections of trusses. s. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved, (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interior is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. t0. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS.- In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced bvthe building department. INSPECTION CARn The permit holder or his agent shall post the inspection record on the job site in an accessible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the hermit holder untie the final inspection has been made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767, Plumbing.- 359-30 0ex 326 or 313 or 359-3034 Signature.- Building: 359-3020 ex 326 or 313 Date:_