CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from theermitpholder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this code.
1 . LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2.. FOOTING: Commonly made after poles or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:�-r
The foundation inspection shad included excavations for thickened slabs
intended for the support of bearing walls, par#itions, �#�uctural supports, or
equipment and special requirements for woad foundations. All farms and
IcnnVIuny sieei, eiG., snail De in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL.•
5.
7.
a
9.1
10.
Rough inspection: Commonly made prior to covering or con
before fixtures are set, and prior to framing inspection.
TRUSS INSPECTION:— _`
Inspections of trusses.
FRAME INSPECTION. -k Z-Inli
cealment,
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are irk place and after the plumbing, mechanical and electrical
rough inspections ars approved. (Electrical inspection performed through
State of Idaho Electrical Bureau }
LATH AND/OR WALLBOARD INSPECTION,4
Commonly made after all lathing an /or wallboard interior is in place, but
before any plaster is applied, or b f wailbd join s anasteners are
taped and finished.
FINAL PLUMBING AND HEATING -INSPECTION:
Systems in place, fixtures set, ready for occupancy
SIDEWALK INSPECTIONS.F
after forms are set, prior to placing concrete.
FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued whe
12. OTHER INSPECTIONS:
n, on final inspection, building 'is ready to occupy,,
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced by the building depar#n�ent.
INSPECTION CARD
The permit holder or his agent shall post the inspectioo record on the job site in an accessibleand conspicuous place to allow the building official #o mike the required en#ries. The record
shall be maintained by the permit holder until thei final inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior forinspections is be made.
Electrical: 624-3767 Building: 359-3Q�� ex 32+5 or 313
Plumbing: 359-302Q ex 326 or 313 or 359-3Q34
Signature: �• �� MAo1:." N. � * - � Date:__41110I-