Loading...
HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 21-00119 - Adams Elementary School - AdditionInspection Date: 07/09/2021 File Name: 21020CP07092021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/09/2021 345b909c5362d83b-1625835477919 1 4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com Daily Field Report Project Name: Adam's Elementary Start Time: 04:30 AM Client: Madison School District Contractor: Mills Concrete End Time: 07:15 AM Inspection Type(s): Concrete Placement Location(s): Interior slab of a small classroom joining the extention to the old school building. Observations/ Remarks: The contractor was using a concrete pump for pouring. The contractor was okay with the slump (6.25 inches). Items observed are in general conformance with approved project documents and jurisdictional requirements. Inspection Images: Inspection Date: 07/09/2021 File Name: 21020CP07092021YK Inspector's Signature:Inspector's Name: Yannick Kabwika Reviewer's Signature:Reviewer's Name: E. Vail Reviewed Date: 07/09/2021 345b909c5362d83b-1625835477919 2