HomeMy WebLinkAboutSPECIAL CONCRETE INSPECTION - 21-00119 - Adams Elementary School - AdditionInspection Date:
07/09/2021
File Name:
21020CP07092021YK
Inspector's Signature:Inspector's Name:
Yannick Kabwika
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/09/2021
345b909c5362d83b-1625835477919 1
4103 E 605 N Suite 1 Rigby, ID 83442 208.881.0081 www.connectengr.com
Daily Field Report
Project Name:
Adam's Elementary
Start Time:
04:30 AM
Client:
Madison School District
Contractor:
Mills Concrete
End Time:
07:15 AM
Inspection Type(s):
Concrete Placement
Location(s):
Interior slab of a small classroom joining the
extention to the old school building.
Observations/ Remarks:
The contractor was using a concrete pump for pouring. The contractor was okay with the slump (6.25
inches).
Items observed are in general conformance with approved project documents and jurisdictional requirements.
Inspection Images:
Inspection Date:
07/09/2021
File Name:
21020CP07092021YK
Inspector's Signature:Inspector's Name:
Yannick Kabwika
Reviewer's Signature:Reviewer's Name:
E. Vail
Reviewed Date:
07/09/2021
345b909c5362d83b-1625835477919 2