Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00017 - Colonial House Apartments - RemodelCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of inspections: For on-site construction, from time to time the building official, upon notification from the pe rmft holdernor his agent, shad make or pause to be made any necessary inspections and shall either approve that portion of the construction as completed or shad notifythe permit holder ar his agent whereir� the sfails to cor� l with #his jae, � . LAYOUT* Lot corners Staked',Stakinginplace� �2. FQQTING: building, prior to excavation: Commonly made after Po�es or piers are set or trenches or basement areas are excavated. 'Forms and horizontal reinforcing tied in place, vesica! reinforcing cut and on jab site or tied in place - 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened nabs intended for the support of fearing wails, partitions, structural supports, or equipment and special requirements dor wood found'ations. AI! forms and reinforcing steel, etc., shall be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: dough inspection: Commonly mace prior to covering or concealment before fixtures are set, and prior to framing inspection. , 5. TRUSS INSPECTION: Inspections of trusses. 6. FRANCE INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and I C C I rough inspections ars approved. (Electrical inspection performed through State of IdahoEiectrical Bureau) 7. LATH AND/OR V1lALLB�ARa NSP'EC [ON: Commonly mads after all lathing and/or wallboardinterio is place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTl0N: AIS systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After farms are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after h buiiding is completed and ready for occupancy . 11. OCCUPANCY PERMIT.- Issued when, on final inspection, building is ready to occupy, 12. ETHER INSPECTIONS: In addition to the called inspections move, the building de partment may maks or require any other inspections to ascertain compliance with this code and other laws enforced b%l the building department. The permit harder or his agent shall INSPECTION hinspection CAPD post record on the job site`in an accessible and conspicuous place to allow the building official to mike the required entries. The retard shall be maintained by the permit holder until this final inspection has been made I have read the above and will comIy in my requests for inspections by end approved, hl4TICE prior dor inspections tt� be made. Electrical: 624-3767 �. .... Plumbing:- 359-3020 ex 32b or 313 or 3.59-3034 buutlmg: 359-3020 ex 326 or 313 Signature:. low date: