Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00014 - Valley River Center - Commercial RemodelCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections'. For on-site construction, from time to time the building offici�ll Up9n nO�i�I��iiO� tro�n Ih� p����4 do d ti' er or is agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: �. FOO I IV�: �bt��tOr1 y made a�ter po es or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job, site or tied in place. 3. FOUNDATION INSPECTION: The foundation inspection shall included excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for woad fvundatians. All forms and reinforcing steel, etc,, shall be in place. 4. PLUMBING, MECHAN#CAL ASVD ELECTRICAL: Rough inspection.- Commonly made prior to covering or concealment, before fixtures ars set, and prior to framing inspection. 5. TRUSS INSPECTION: Inspections of trusses. , 6. FRAME INSPECTION,: Commonly made after the roof, all framing, firestopping, draftstopping and bracing ars in place and after the plumbing, mechanical and electrical rough insr)ections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 7. LATH AND/OR WALLBOARD INSPECTION: Commonly mads after all lathing and/or wallboard interioris in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures yet, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms. are set, prior to placing concrete. 10. FINAL INSPECTION: Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12, OTHER INSPECTIONS. In addition is the called inspections above, the building department may maks or require any other inspections to ascertain compliance with this code and other laws enforced bv the building department. INSPECTION CARS The permit holder or his agent shall posh the inspection record on the job le' n ars accessible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit holder until the final inspection has been made and approved. I have read the move and will comply in my requests for inspections by giving 24 HOUR NOTICE prior dor inspec..,I-iQns to be made. Electrical: 624-37G7' fN, Building: 359-3020 ex 326 or 313 P lumbing: 340--3.a20 ex 3 �1 or � Signature� ate : � �