Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00013 - Holladay Apartments - RemodelW P H a [#I WOO Evmj "KPS • Y BUILDING INSPECTION SEQUENCE yNc 1HbPCt;J1u1Js: ror on-site construction, f th rom time to time the buildin� ins616M�� g an� s qu � OilId111 9s completed or shall notify the permit holder or his agert therein the same fails tO comply with this code. 1. LAYOUT: � � Lot c ornesrs staked, staking in place for building, prior to excavation: 2. FOOTING: ` Commonly made after poles or piers are set or trenches or basement !- - F areas are excavated. orms and horizontal reinforcing tied in place, vertical reinforcing cut and on job si 3. FOUNDATION INSPECTION: te or tied in place. The foundation inspection shall included excavations for thickened slabs intended for t1_,Ali he support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. All forms, and reinforcing steel, etc., straA be in place. 4. PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection: Commonly made prior to covering or concealment, before fixtures are set, and prior to framing inspection. 5. TRUSS INSPECTION: may',; ,•, r ,, Inspections of trusses'. 6. FRAME INSPECTION: Commonly made after the roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau) 0r,,j � 7, LATH'AND/OR WALLBOARD INSPECTION: �=Jf , Commonly made after afi lathing and/or wallboard interior is in place, but. before any piaste'' r is applied, or before wallboard joints and fasteners are taped and finished. 8. FINAL PLUMBING AND HEATING INSPECTION: ��, All systems in place, fixtures set, ready for occupancy 9. SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. 10. FINAL INSPECTION: �✓�� �- , .�-,,4 , Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above,jthe building department may make or require any other inspections to ascertain compliance with this code and other laws enforced bv the building department. RD The permit holder or�his-agent shall post N ionrecord on the job site in an accessible and conspicuous place to allow the building official to make the required entries. The record shall be maintained by the permit holder until the final inspection has been, made and approved. I have read the above and will comply in my requests for inspections by giving 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 m359-3020Building: 359-3020 ex 31C 6 or 313 Plubing: ex 326 or 3 r 3 or 359-3034 Signature:Date: In