HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00012 - Dr Christensen Doctors' OfficeCITY 0p PE19UP.fl
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-site construction, from time to time the building official, upon
notification from the Permit holder Qr hiS agent ' Shall maKQ or G1Q p� mi�� i,Hy q 001�
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same pails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2. FOOTING: Commonly made after pales or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for Thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for wood foundations. 'All dorms and
reinforcing steel, etc., shall be in place.
4. PLUMBING, MECHANICAL ANS ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION.r
Inspections of trusses.
6. FRAME INSPECTION;
Commonly made after the roof, all framing, firestopp-ing, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTI-ON:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING AND HEATING�f�SPECT���:
AEI systems in place, fixtures set, ready f ar viceupan�y
9�. SIDEWALK INSPECTIONS:
After farms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
make or require any other inspections to ascertain compliance with this
cede and other laws enforced bv the building department.
INSPECTION C'dRn
v + a Ma 1■ R`F
The hermit holder or his agent shall past the ins,plection record on the job site in an accessible
and conspicuous place to allow the building official to mike the required entries. The record
shatl be maintained by the perm it holder until the final inspection has been made and approved.
i have read the above and will comply in my requests for inspections by g[ving 24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767 Building: 359-3020 ex 326 or 313
Plumbing., 359-3020 x 3,96 or 313 0 359-3(734
Signature:
Date: 0 Zoo