HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00011 - Brighton ApartmentsCITE OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For an -sits construction, from time to time the building official, upon
notification from the permit holder or his agent, shall maks or cause to be made any necessary
inspections and shill either approve that portion of the construction as completed or shah notify
the permit holder or his agent wherein the same fails to comply with this code,
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
2., FOOTING: Commonly made after poles or piers are sit or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing walls, partitions, structural supports, or
equipment and special requirements for woad foundations. All forms and
reinforcing steel, eta., shall be in ace.
4. PLUMBING, MECHANICAL AND ELECTRICAL':
Rough inspection: Commonly made pr11
ior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INS,PECTION:
inspections of trusses.
6. FRAME INSPE,CTION',
Commonly made after the roof, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
commonly made after all lathing and/or wallboard interior is in place, but
before any piaster is applied, or before wallboard joints and fasteners are
tapeta and finished_ 0
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After formsare set, prior to placing concrete.
16. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the budding department may
make or require any other inspections to ascertain compliance with this
code and other laws enforced bv the building department.
INSPECTION CARD
The permit holder or his agent shall past the inspection record on the jab site fn an accessible
and conspicuous place to allow the building official to mike the required entries. the record
shad be maintained by the permit holder until the final inspection has been mads and approved.
I have read the above and will comply in mfr requests for inspections by giving 24 HOUR
NOTICE prior for inspections to bemade.
Cir.i.fr�r..l. C/iA +77F_1
Building:
CGlI1Gdl. OL4'J/ 0 / 359-3020 2x 326 Or 313
Plumbing: 359-3020 ex 326 or 3i3 or 359-3084
Signature:
�—��/% `L�-���� Date:_