HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00008 - Mattson ApartmentsCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections: For on-siteconstruction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be made any necessary
inspections and shall either approve that portion of the construction as completed or shalt notify
the permit holder or hes agent wherein the same fails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, prior to excavation:
�. T IG!
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or tied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shah included excavations for thickened slabs
in#ended for the support of bearing wails, partitions, structural supports, or
equipment and special requirements for wood foundations. All forms and
reinforcing steel, etc., shah be in place.
4. PLUMBING, MECHANICAL AND ELECTRICAL:
Rough inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior, to framing inspection.
5, TRUSS INSPECTION:
Inspections af trusses.
6. FRAME INSPECTION:
Commonly made after the rood, all framing, firestopping, draftstopping and
bracing are in place and after the plumbing, mechanical and electrical
rough 'inspections are approved. (Electrical inspection performed through
State of Idaho Electrical Bureau)
7. LATH AND/OR WALL.BOARD INSPECTION:
Commonly rade after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8, FINAL PLUMBING AND HEATING INSPECTION.
AIS systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms ars set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy.
11. OCCUPANCY PERMIT:
Issued when on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the colied inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
code and other laws enforced bv the building department.
INSPECTION CARD
The permit holder or his agent shall post the inspectian record on the job site in an accessible
and conspicuous glace to allow the building official -to make the required entries. The record
shall be maintained by the permit Holder until the final inspection has been mace and approVed.
I have read the above and will comply in my requests for inspections by giving 24 HOUR
NOTICE prior for inspections to be made.
Electrical.- 624-3767 Building: X59--3020 ex 326 or 313
Plumbing: 35P-302326,or 313 or 359-3034
S'Ignature:
Date. -
fl