CITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type. of Inspections-. For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, snail make or cause to be madeany necessary
inspections and shall either aPProvg �n�1 qI10ul the coqs1lucilop 99 �Om�lor sh2�� notily
e permit holder or his agent wherein the same fails to comply with this code.
1. LAYOUT: Lot corners staked, staking in place for building, Prior to excavation.
2' FOOTING: Commonly 1112dA a{der pokes or piers are set or trenches or basement
areas are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on job site or lied in place.
3. FOUNDATION INSPECTION:
The foundation inspection shatl included excavations for thickened subs
intended for the support of bearing walks, Partitions, structural supports, or
equipment and special requirements dor wood foundations. Al
I forms and
reinforcing steel, etc., shall be in place.
4. PLUIVIBING, MECHANICAL ASID ELECTRICAL:
Rough inspection; Commonly made prior to covering or concealment,
before fixtures are sed, and prior to framing inspec#ion.
5. TRUSS INSPECTION:
Inspections of trusses.
fi. FRAME INSPECTION-
Commonly
made after the- roof, all framing, firestopping, draftstopping' and
bracing are in place and after the plumbing, meGhanical and eleC#rica,l
rough inspections ars approved. (Electrical inspection performed through
State of Idaho Electric I Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commbnly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished.
8. FINAL PLUMBING SND HEATING INSPECTION:
10
9.0 All systems in place, fixtures set, ready for occupancy
SIDEWALK INSPECTIONS:
After farms are set, prior to placing cor�+�ret�.
10. FINAL INSPECTION:
11.
Commonly made after the building is completed and reed for Q�cuP�n�
OCCUPANCY PERMIT: � Y
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS:
In addition to the called inspections above, the building department may
maks or require any other inspections to ascertain camplianc+e with this
code and other laws enforced by the bu4
ilding department.
the permit holderor his agent shallpostNS��CT��� CARD
9 the inspection record ars the jab s1 #e in an accessible
and conspicuous piaci to allow the building otticial to make the required entries. The record
shall be maintained by the permit holder antil the final inspection his been made and approved.
haus read the above and will comply in my requests for inspections by �����I�OTlCE prior for inspections to be made. p giving 24
Electrical: 624-3767 Building: 359-3020 ex 326or3 3
Plumbing.* 359-3020 ex 326 or 31$, or 359-3(}34
Signature;
Date: