Loading...
HomeMy WebLinkAboutINSPECTION SEQUENCE - 02-00006 - Nauvoo ApartmentsCITY OF REXBURG BUILDING INSPECTION SEQUENCE Type of Inspections: For on-site construction, from time to time the building officia'l, upon notification from the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with this code. 11. LAYOUT: Lot corners staked, staking in place for building, prior to excavation: 2. FOOTING.- Commonly made after poles or piers are set or trenches or basement areas are excavated. Forms and horizontal reinforcing tied in place, vertical reinforcing cut and on job site or tied in place. 3. FOUNDATION INSPECTION: 4. 5. X1 7. 05) 1019 The foundation inspection shad included excavations for thickened slabs intended for the support of bearing wails, partitions, structural supports, or equipment and special requirements for wood foundations. AIS forms and reinforcing steel, etc., shall be in place, PLUMBING, MECHANICAL AND ELECTRICAL: Rough inspection-, Commonly made prior to covering or congealment, `1 before fix#ures are set, and prior to framing ins ` TRUSS INSPECTION: Inspections of trusses. FRAME INSPE.CTIO.N: pection. Commonly made after the- roof, all framing, firestopping, draftstopping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Electrical inspection performed through State of Idaho Electrical Bureau,) LATH AND/OR WALLBOARD INSPECTION: Commonly made after all lathing and/or wallboard interioris in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. FINAL PLUMBING AND HEATING INSPECTION: All systems in place, fixtures set, ready for occupancy SIDEWALK INSPECTIONS: After forms are set, prior to placing concrete. FINAL INSPECTION, Commonly made after the building is completed and ready for occupancy. 11. OCCUPANCY PERMIT: Issued when, on final inspection, building is ready to occupy. 12. OTHER INSPECTIONS: In addition to the called inspections above, the building department may make or require any other inspections to ascertain compliance with this code and other laws enforced b).1 the building department. INSPECTION CARD The permit holder or his agent shall post the inspection record on the fob site in an accessible and conspicuous piece 'to allow the building official to mike the required entries. Thelie+�-, W04 ord shadl be maintained by the permit holder until the final inspection has been made end approved. have read the above and will comply in my requests for inspections by gilding 24 HOUR NOTICE prior for inspections to be made. Electrical: 624-3767 Building: 35'9-3020 ex 32G or 313 Plumbing: 359-3020 ex 326, or 313 or 359-3p34 Signature: F Date. - RM