HomeMy WebLinkAboutDOCS - 02-00002 - Sleep Institute - RemodelCITY OF REXBURG
BUILDING INSPECTION SEQUENCE
Type of Inspections. For on-site construction, from time to time the building official, upon
notification from the permit holder or his agent, shall make or cause to be mads any necessary
inspections and shall either approve that portion of the construction as completed or shall notify
the permit holder or his agent wherein the same fails to comply with this cede.
1, LAYOUT: Lit corners naked, staking in plate for building, prior to excavation:
2. FOOTING: Commonly made afterpoles or piers are sed or trenches or basement
arias are excavated. Forms and horizontal reinforcing tied in place,
vertical reinforcing cut and on dab site or died in place.
3. FOUNDATION INSPECTION:
The foundation inspection shall included excavations for thickened slabs
intended for the support of bearing wails, partitions, structural supports, or
equipment and special requirements for wood foundations'. ASI farms and
reinforcing steel, etc., shad be in place.
4. PLUMBING, MECHANICAL SND ELECTRIC -AL:
Baugh inspection: Commonly made prior to covering or concealment,
before fixtures are set, and prior to framing inspection.
5. TRUSS INSPECTION.a
Inspections of trusses,
6. FRAME INSPECTION:
Commonly made after the roof, all framing, firestopping, draftStopping and
bracing are in place and after the plumbing, mechanical and electrical
rough inspections are approved. (Electrical inspection performed through
Stateof Idaho Electrical Bureau)
7. LATH AND/OR WALLBOARD INSPECTION:
Commonly made after all lathing and/or wallboard interior is in place, but
before any plaster is applied, or before wallboard joints and fasteners are
taped and finished. }
8. FINAL PLUMBING AND HEATING INSPECTION:
All systems in place, fixtures set, ready for occupancy
9. SIDEWALK INSPECTIONS:
After forms are set, prior to placing concrete.
10. FINAL INSPECTION:
Commonly made after the building is completed and ready for occupancy .
11. OCCUPANCY PERMIT:
Issued when, on final inspection, building is ready to occupy.
12. OTHER INSPECTIONS.
In addition to the called inspections above, the building department may
maks or require any other inspections to ascertain compliance with this
code and other laws enforced by the, building department-,
INSPECTIONCARD
The permit holder or his aged shall past the inspection record on the job site in an accessible
and conspicuflus place to allow the building official to mike the required entries. The record
shall be maintained by the permit holder until the find inspection has been made and approved.
I have read the above and will comply in my requests for inspections by giving,24 HOUR
NOTICE prior for inspections to be made.
Electrical: 624-3767 Building; 359-3D20 ex 326 c)r 313
Plumbing: 359-3Q20 ex 326 or 313 or 359-3Q34
Signature:
/Imv� /_7Date:
Subject:
Date: Fri, 08
Feb 2002 18: 03: 3 0 -0 700
From: "Chris Huskinson" <huskinsonhotnail.cvM>
To: m.ari.lynCo)ci.rexburg.id_us
Honey!
The Sleep Institute and En'ckson's Pontiac (GASP!.) have actually passed their final fire inspection ....... I'm
sure they ua'11 be looking you up ASAP. Also, could you, kindly'degudear Janet in tbefiner pointy of
scheduling inspections.... no more Iasi minute items'. Is !
Hugs,
CH
.+rw+��..:z..-�a�+,rs.,��.------�....�.rr�!r.•E�..+.et4.-r,rsr,��urr^�-��r�-�-�w�:_,��.,:ti-.P--„r�.s..�.a,.c�,���+�+-r��--..-.,.�.�i-----,.F����..r±.+'xerrs�N���ra�+ww.ewesarm+wnro--eri,.,�,N,erss,.�c_,.4.._...�.�.u...a��:�.�:_A,..u.:��•�Y,r;�,•i;��:�,wr.r.�►�•au�r�•erica+..wv.or.�+�.�r�a+�.:-�M+rc��s R_.a.�a..•.,�.+�...,�.,a�-:•
MSN Photos is the easiest way to share and print your photos-. Chick Here
Of 1 2/1112002 9:02 AM